Centralized bid evaluation for awarding of construction projects - A case of India government

被引:39
|
作者
Padhi, Sidhartha S. [1 ]
Mohapatra, Pratap K. J. [1 ]
机构
[1] Indian Inst Technol Kharagpur, Dept Ind Engn & Management, Kharagpur 721302, W Bengal, India
关键词
Goal programming; Contractor selection; Project management; CONTRACTOR SELECTION; MODEL; PROCUREMENT; AUCTIONS; PROPOSAL; UTILITY;
D O I
10.1016/j.ijproman.2009.06.001
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Reviewing the procedures of contractor selection in government departments in various countries and in the Rural Development Department (RDD) in India, this paper brings out several weaknesses of the current contractor selection procedure. It suggests a centralized contractor evaluation process with the inclusion of three new selection attributes along bid price. The suggested attributes are: (1) time quoted to complete the project, (2) warranty period quoted, and (3) past performance score of the contractor. To solve the resulting multi-objective decision-making problem, the paper proposes a binary goal programming model. When tested with the existing contractor selection procedure for six past projects in RDD, the model yields the same results as those taken by RDD in the past, confirming the credibility of the model. When tested with the suggested procedure, the model yields much superior results. (C) 2009 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:275 / 284
页数:10
相关论文