共 50 条
- [42] Research On Invite Bid Models Of Public Projects Invested By Government Based On Principal-Agent Theory PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL II, 2008, : 443 - +
- [44] Research on cost control method based on EVM for aerospace advanced development projects in China PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2327 - 2332
- [46] Cost Control in the Design Stage of Transmit Electricity Projects based on Value Engineering Method 2009 SECOND INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING: KAM 2009, VOL 2, 2009, : 308 - 311
- [47] THE ANALYSIS OF UNIT COST OF ADULT ANGIOGRAPHY SERVICES IN A STATE HOSPITAL BY ACTIVITY-BASED COST METHOD NOBEL MEDICUS, 2013, 9 (01): : 10 - 16
- [48] STUDY FOR TOTAL COST OF DESIGN ACTIVITY BASED ON FUZZY SETS MODTECH 2011: NEW FACE OF T.M.C.R., VOL I AND II, 2011, : 93 - 96
- [49] A Subsidy Model of Green Buildings based on Government Cost 2010 INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT (CCCM2010), VOL IV, 2010, : 292 - 295
- [50] The Research of Environmental Costs Based On Activity Based Cost 2011 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND INFORMATION APPLICATION TECHNOLOGY ESIAT 2011, VOL 10, PT A, 2011, 10 : 147 - 151