Evaluating the Impact of Spare Parts Pooling Strategy on the Maintenance of Unreliable Repairable Systems

被引:4
|
作者
Chemweno, Peter K. [1 ]
Pintelon, Liliane [1 ]
Muchiri, Peter N. [2 ]
机构
[1] Ctr Ind Management Traff & Infrastruct, B-3001 Heverlee, Belgium
[2] Dedan Kimathi Univ Technol, Nyeri, Kenya
来源
IFAC PAPERSONLINE | 2015年 / 48卷 / 03期
关键词
Unreliable asset; Spare parts provisioning; Repairable System; Component Reconditioning; INVENTORY SYSTEM; MULTI-INDENTURE; MULTIECHELON; MODELS;
D O I
10.1016/j.ifacol.2015.06.212
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In today's industries, optimal spare parts provisioning plays a critical role towards sustaining the asset's operational capabilities. In this context, spare parts pooling is increasingly mentioned as a plausible approach for optimizing spare parts management. more so for repairable systems. In this sense, several frameworks are proposed in literature, though largely analytical, thus limiting their capabilities with respect to modeling complex repairable systems. Moreover, the nature of interactions often account for aspects such as system reliability, imperfect component reconditioning, repair capacity and spare parts inventory that is multi-echelon in nature. To realistically model such complexities, simulation approaches are often explored. This paper presents a discrete event simulation modeling study. The simulation model mimics the impact of several aspects on unreliable repairable systems. The aspects include the repair capacity, component reconditioning process, and multi-echelon spare part provisioning strategy. Moreover, the influence of spare parts quality aspects is evaluated and demonstrated in the case study of critical system for a thermal power plant. (C) 2015, IFAC (International Federation or Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:989 / 994
页数:6
相关论文
共 50 条
  • [31] An improved integrated maintenance/spare parts management for wind turbine systems with adopting switching concept
    Abderrahmane, F.
    Bouslikhane, S.
    Hajej, Z.
    Dellagi, S.
    Trabelsi, W.
    ENERGY REPORTS, 2022, 8 : 936 - 955
  • [32] Joint Optimization of Preventive Maintenance, Spare Parts Inventory and Transportation Options for Systems of Geographically Distributed Assets
    Wang, Keren
    Djurdjanovic, Dragan
    MACHINES, 2018, 6 (04)
  • [33] Operational Supply Chain Planning Method for Integrating Spare Parts Supply Chains and Intelligent Maintenance Systems
    Israel, Eduardo F.
    Albrecht, Andre
    Frazzon, Enzo M.
    Hellingrath, Bernd
    IFAC PAPERSONLINE, 2017, 50 (01): : 12428 - 12433
  • [34] Joint optimization of preventive maintenance and inventory management for standby systems with hybrid-deteriorating spare parts
    Zhang, Jian-Xun
    Du, Dang-Bo
    Si, Xiao-Sheng
    Hu, Chang-Hua
    Zhang, Han-Wen
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 214
  • [35] Operational Supply Chain Planning Method for Integrating Spare Parts Supply Chains and Intelligent Maintenance Systems
    Israel, Eduardo Francisco
    Frazzon, Enzo Morosini
    Cordes, Ann-Kristin
    Hellingrath, Bernd
    Lopes, Andre Albrecht
    DYNAMICS IN LOGISTICS, LDIC, 2014, 2016, : 453 - 462
  • [36] Integrated-Optimization of Production, Preventive Maintenance and Spare Parts Inventory of Continuous Operating Series Systems
    Adhikary, Debasis Das
    Jana, Dipak Kumar
    RECENT ADVANCES IN INTELLIGENT INFORMATION SYSTEMS AND APPLIED MATHEMATICS, 2020, 863 : 130 - 145
  • [37] Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems
    Zhang, Xiaohong
    Zeng, Jianchao
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (02) : 479 - 498
  • [38] Environmental Impact Assessment Regarding Predictive Maintenance Operations for Passenger Cars Based on Spare Parts Life Cycle
    Cucu, Sorin
    Dumitru, Bogdan
    VISION 2025: EDUCATION EXCELLENCE AND MANAGEMENT OF INNOVATIONS THROUGH SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE, 2019, : 11727 - 11733
  • [39] Impact of spare parts remanufacturing on the operation and maintenance performance of offshore wind turbines: a multi-agent approach
    Mohammed Dahane
    M’hammed Sahnoun
    Belgacem Bettayeb
    David Baudry
    Hamza Boudhar
    Journal of Intelligent Manufacturing, 2017, 28 : 1531 - 1549
  • [40] Impact of spare parts remanufacturing on the operation and maintenance performance of offshore wind turbines: a multi-agent approach
    Dahane, Mohammed
    Sahnoun, M'hammed
    Bettayeb, Belgacem
    Baudry, David
    Boudhar, Hamza
    JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (07) : 1531 - 1549