Mine geology practices at the Sunrise Open Pit

被引:0
|
作者
Haren, E [1 ]
Williams, P [1 ]
机构
[1] Placer Granny Smith Pty Ltd, Laverton, WA 6440, Australia
来源
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Sunrise deposit is one of Australia's largest and most profitable gold deposits. It has consistently and spectacularly outperformed every resource model created. Currently over the life of the Sunrise pit there has been a 50 per cent under estimation of ounces mined. Without a solid basis for predicting the tonnes and grade or the spatial location of mineralisation, mine planning becomes problematic. Recently, through a better understanding of the mineralising processes the reconciliation of the resource model has improved to be in the order of ten per cent under on ounces mined. This paper will describe how the mine geologists at Placer Granny Smith have implemented the changes required to improve the resource model. Work began with the development of a three-dimensional lithological and structural model based on historical drilling and pit mapping. Continual updating of the geological model with grade control logging, assays and in pit face mapping, now allows for the on-going improvement of the resource model and the planning of mine development drilling.
引用
收藏
页码:77 / 86
页数:10
相关论文
共 50 条
  • [31] PREPLANNING FOR AN OPEN PIT COPPER MINE.
    Kirk, Steven J.
    O'Neil, Thomas J.
    [J]. ASTM Special Technical Publication, 1980,
  • [32] Application of pit optimisation technique for Malanjkhand open pit copper mine
    Trehan, LK
    Bhattacharya, A
    Kumar, S
    [J]. MINE PLANNING AND EQUIPMENT SELECTION 2001, 2001, : 541 - 546
  • [33] Improved optimization algorithm of ultimate pit for open pit metal mine
    Xu, Xiao-Chuan
    Gu, Xiao-Wei
    Wang, Qing
    Liu, Jian-Ping
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2014, 35 (08): : 1195 - 1198
  • [34] Mine Dewatering Studies at Jwaneng Open Pit Diamond Mine - Botswana
    Mafa, Benjamin
    [J]. MINE WATER AND THE ENVIRONMENT, PROCEEDINGS, 2008, : 465 - 468
  • [35] Computer-aided mine planning for an open-pit mine
    Solanki, M.K.S.
    Kanodia, H.K.
    [J]. Journal of the Institution of Engineers (India), Part MI: Mining Engineering Division, 1990, 71 (02):
  • [36] Open pit mine production design of planning at mclaughlin gold mine
    Artittong, S.
    Dagdelen, K.
    Gurgur, C.Z.
    [J]. Bulk Solids Handling, 2010, 30 (01): : 32 - 36
  • [37] CASE STUDY OF AN OPEN PIT COAL MINE DESIGN USING PIT OPTIMIZATION
    Lee, Chung-In
    Heo, Seung
    Ko, Soon Bang
    Shin, Mi Ktoung
    Kwon, Sangwook
    Ko, Myeong-Jae
    Kim, Jae Ho
    [J]. NEW DEVELOPMENT IN ROCK MECHANICS AND ENGINEERING (NDRM2012), 2013, : 22 - 25
  • [38] Ultimate pit optimization with environmental problem for open-pit coal mine
    Xu, Xiaochuan
    Gu, Xiaowei
    Wang, Qing
    Zhao, Yunqi
    Zhu, Zhenguo
    Wang, Fengdan
    Zhang, Zaolin
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 173 : 366 - 372
  • [39] Landslide mechanism and stability of an open-pit slope: The Manglai open-pit coal mine
    Chen, Tao
    Shu, Jisen
    Han, Liu
    Tovele, Gerson. S. V.
    Li, Baosheng
    [J]. FRONTIERS IN EARTH SCIENCE, 2023, 10
  • [40] Evaluation of open pit mine slope stability analysis
    Verma, Dhananjai
    Thareja, Rahul
    Kainthola, Ashutosh
    Singh, T.N.
    [J]. International Journal of Earth Sciences and Engineering, 2011, 4 (04): : 590 - 600