Mine geology practices at the Sunrise Open Pit

被引:0
|
作者
Haren, E [1 ]
Williams, P [1 ]
机构
[1] Placer Granny Smith Pty Ltd, Laverton, WA 6440, Australia
来源
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Sunrise deposit is one of Australia's largest and most profitable gold deposits. It has consistently and spectacularly outperformed every resource model created. Currently over the life of the Sunrise pit there has been a 50 per cent under estimation of ounces mined. Without a solid basis for predicting the tonnes and grade or the spatial location of mineralisation, mine planning becomes problematic. Recently, through a better understanding of the mineralising processes the reconciliation of the resource model has improved to be in the order of ten per cent under on ounces mined. This paper will describe how the mine geologists at Placer Granny Smith have implemented the changes required to improve the resource model. Work began with the development of a three-dimensional lithological and structural model based on historical drilling and pit mapping. Continual updating of the geological model with grade control logging, assays and in pit face mapping, now allows for the on-going improvement of the resource model and the planning of mine development drilling.
引用
收藏
页码:77 / 86
页数:10
相关论文
共 50 条
  • [1] Mine geology practices at the sunrise open pit
    Haren, E.
    Williams, P.
    [J]. Australasian Institute of Mining and Metallurgy Publication Series, 2000, (03): : 77 - 86
  • [2] DETOUR LAKE GOLD MINE - GEOLOGY OF A LARGE OPEN TONNAGE PIT
    MARMONT, S
    [J]. CIM BULLETIN, 1985, 78 (879): : 32 - 32
  • [3] EVOLUTION OF OPEN-PIT DRILLING AND BLASTING PRACTICES AT NORMANDIE MINE
    HALL, RB
    MCMENAMI.JE
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (653): : 1103 - &
  • [4] Blasting practices at the New Cornelia open-pit copper mine
    Angst, HH
    Cochrane, RA
    [J]. TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1943, 153 : 233 - 247
  • [5] Engineering geology and mechanism of multiple landslides in a large open-pit mine: the case of the Copper Mine in Qinghai Province, China
    Feifei Wang
    Qingyang Ren
    Xueliang Jiang
    Jiayong Niu
    Bin Chen
    [J]. Bulletin of Engineering Geology and the Environment, 2023, 82
  • [6] Engineering geology and mechanism of multiple landslides in a large open-pit mine: the case of the Copper Mine in Qinghai Province, China
    Wang, Feifei
    Ren, Qingyang
    Jiang, Xueliang
    Niu, Jiayong
    Chen, Bin
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2023, 82 (04)
  • [7] Engineered open pit mine backfilling
    Sevick, GW
    Hutchison, JB
    Murphy, J
    Chapman, JT
    [J]. TAILINGS AND MINE WASTE '98, 1998, : 45 - 54
  • [8] NACIMIENTO OPEN PIT COPPER MINE
    KRAUSSE, DM
    HALL, WB
    [J]. MINING CONGRESS JOURNAL, 1971, 57 (11): : 75 - &
  • [9] Open pit mine production scheduling
    Caccetta, L
    Kelsey, P
    Giannini, L
    [J]. THIRD REGIONAL APCOM: COMPUTER APPLICATIONS IN THE MINERALS INDUSTRIES INTERNATIONAL SYMPOSIUM, 1998, 98 (05): : 65 - 72
  • [10] Swelling rocks in an open pit mine
    Bilir, M. E.
    Aydingun, E.
    [J]. ROCK MECHANICS FOR RESOURCES, ENERGY AND ENVIRONMENT, 2013, : 647 - 651