A MULTI-OBJECTIVE HYBRID DIFFERENTIAL OPTIMIZATION ALGORITHM FOR FLOW-SHOP SCHEDULING PROBLEM

被引:5
|
作者
Pei, J. Y. [1 ]
Shan, P. [1 ]
机构
[1] Jiangnan Univ, Sch Business, Wuxi 214122, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Flow-Shop Scheduling Problem (FSP); Multi-Objective Optimization; Hybrid Differential Evolution; Genetic Algorithms (GA);
D O I
10.2507/IJSIMM18(3)CO11
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper puts forward a multi-objective hybrid difference optimization algorithm to solve multi-objective flow-shop scheduling problem (FSP). The hybrid algorithm inherits the merits of differential evolution vector operation, and makes dynamic adjustments to the search direction based on historical data. However, the basic differential evolution algorithm is prone to the local optimum trap, due to the low population diversity in the later stage of evolution. To solve the problem, a hybrid sampling strategy was introduced obtain the distribution information of solution sets and to design the mutation operator of differential evolution, thus improving the convergence of the hybrid algorithm. Finally, our algorithm was applied to solve FSPs through simulation. The simulation results show that our algorithm greatly outperformed the basic multi-objective evolutionary algorithm in convergence and distribution performance.
引用
收藏
页码:500 / 509
页数:10
相关论文
共 50 条
  • [21] A hybrid algorithm for multi-objective job shop scheduling problem
    Li, Junqing
    Pan, Quanke
    Xie, Shengxian
    Gao, Kaizhou
    Wang, Yuting
    2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3630 - 3634
  • [22] A hybrid multi-objective gray wolf optimization algorithm for a fuzzy blocking flow shop scheduling problem
    Yang, Zhi
    Liu, Cungen
    ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (03):
  • [23] Solving a multi-objective overlapping flow-shop scheduling
    Huang, Rong-Hwa
    Yang, Chang-Lin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (9-10): : 955 - 962
  • [24] Solving a multi-objective overlapping flow-shop scheduling
    Rong-Hwa Huang
    Chang-Lin Yang
    The International Journal of Advanced Manufacturing Technology, 2009, 42 : 955 - 962
  • [25] Solving a multi-objective overlapping flow-shop scheduling
    Huang, Rong-Hwa
    Yang, Chang-Lin
    International Journal of Advanced Manufacturing Technology, 2009, 42 (9-10): : 955 - 962
  • [26] Multi-objective flow-shop scheduling with parallel machines
    Murrieta Cortes, Beatriz
    Espinoza Garcia, Juan Carlos
    Regis Hernandez, Fabiola
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2796 - 2808
  • [27] Design of multi-objective evolutionary algorithms: Application to the flow-shop scheduling problem
    Basseur, M
    Seynhaeve, F
    Talbi, EG
    CEC'02: PROCEEDINGS OF THE 2002 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2002, : 1151 - 1156
  • [28] Multi-objective optimization with fuzzy measures and its application to flow-shop scheduling
    Giannopoulos, Nikos
    Moulianitis, Vasilis C.
    Nearchou, Andreas C.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2012, 25 (07) : 1381 - 1394
  • [29] A hybrid genetic algorithm for the flow-shop scheduling problem
    Tseng, Lin-Yu
    Lin, Ya-Tai
    ADVANCES IN APPLIED ARTICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4031 : 218 - 227
  • [30] Multi-Objective Hybrid Flow-Shop Scheduling Problem Considering Energy Consumption and On-Time Delivery
    Zhou B.
    Liu W.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2019, 53 (07): : 773 - 779