There are four main parties in a design/ build pipeline project: the owner and his representative; the general contractor; the contractor's design engineer (the engineer of record); and the pipe manufacturer. The selection of the pipe manufacturer by the design/build team is critical, since besides providing the pipe design calculations if required, layout drawings, and manufacturing the pipeline, the design/ build team can depend on the manufacturer's expertise to provide recommendations and alternatives to resolve unforeseen field related issues. The additional contribution by the pipe manufacturer can be limited or significant depending on the pre-engineering level of the project and the experience of the project team. Three examples of design/build pipeline projects requiring different levels of technical support by the pipe manufacturer, will be presented: the Tuyaux Bonna/American Pipe and Construction Design/Build team for the rehabilitation of 19 miles of 78-inch PCCP with a steel liner; Archer Western/Winzler & Kelly for the construction 9.5 miles of potable and reclaimed water steel pipelines ranging in diameter from 24-inch up to 48 inches; and Kiewit/Parson's for the construction of 6000 ft. of 120-inch diameter high pressure steel-tunnel- liner penstock requiring specialized steel with very high toughness properties. Lessons learned from the three projects will also be presented.
引用
收藏
页码:40 / 48
页数:9
相关论文
共 50 条
  • [21] Value Creation in Design-Build Projects
    Bremdal, Jon Harald
    Haddadi, Amin
    Bjorberg, Svein
    Lohne, Jardar
    Laedre, Ola
    2017 12TH INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE ON COMPUTER SCIENCES AND INFORMATION TECHNOLOGIES (CSIT), VOL. 2, 2017, : 58 - 66
  • [22] Concurrent engineering in design-build projects
    Anumba, Chimay J.
    Evbuomwan, Nosa F.O.
    Construction Management and Economics, 1997, 15 (03): : 271 - 281
  • [23] Design-build approach to renovation projects
    Allen, Gregory L.
    HPAC Heating, Piping, Air Conditioning, 1996, 68 (09):
  • [24] DESIGN AND BUILD ELECTRICAL SAFETY INTO CONSTRUCTION PROJECTS
    Crow, Daryld Ray
    Liggett, Danny P.
    Mitchem, James E.
    Work, Frank
    2015 IEEE PETROLEUM AND CHEMICAL INDUSTRY COMMITTEE CONFERENCE (PCIC), 2015,
  • [25] RMC DESIGN-BUILD-TEST PROJECTS
    ELLIS, JS
    ENGINEERING EDUCATION, 1971, 62 (03): : 294 - &
  • [26] The changing role of the client in driving innovation for design-build projects: stakeholders' perspective
    Kilinc, Nida
    Ozturk, Gozde Basak
    Yitmen, Ibrahim
    8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2015, 21 : 279 - 287
  • [27] SOIL PIPE INTERACTION AND PIPELINE DESIGN - DISCUSSION
    AUDIBERT, JME
    NYMAN, KJ
    TRANSPORTATION ENGINEERING JOURNAL OF ASCE, 1982, 108 (02): : 221 - 226
  • [28] PIPELINE DESIGN - ARE CURRENT PIPE STANDARDS ADEQUATE?
    Haswell, Jane
    Boothby, Peter
    PROCEEDINGS OF THE ASME INTERNATIONAL PIPELINE CONFERENCE 2010, VOL 2, 2010, : 53 - 64
  • [29] Impact of Design Risk on the Performance of Design-Build Projects
    Liu, Junying
    Xie, Qunxia
    Xia, Bo
    Bridge, Adrian J.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (06)
  • [30] SOIL-PIPE INTERACTION AND PIPELINE DESIGN
    AHMED, S
    MCMICKLE, RW
    BRASSOW, CL
    TRANSPORTATION ENGINEERING JOURNAL OF ASCE, 1981, 107 (01): : 45 - 58