共 30 条
- [11] CHEN Zhao-wei, SUN Yu, ZHAI Wan-ming, Mapping relationship between pier settlement and rail deformation of high-speed railways-Part (Ⅰ): the unit slab track system, Scientia Sinica (Technologica), 44, 7, pp. 770-777, (2014)
- [12] CHEN Zhao-wei, FANG Hui, Influence of pier settlement on contact behavior between CRTSⅡ track and bridge in high-speed railways, Engineering Structures, 235, (2021)
- [13] CHEN Zhao-wei, Dynamic contact between CRTS Ⅱ slab track and bridge due to time-dependent effect of bridge and its influence on train-track-bridge interaction, Engineering Structures, 234, (2021)
- [14] CHEN Zhao-wei, ZHAI Wan-ming, TIAN Guo-ying, Study on the safe value of multi-pier settlement for simply supported girder bridges in high-speed railways, Structure and Infrastructure Engineering, 14, 3, pp. 400-410, (2018)
- [15] CHEN Zhao-wei, FANG Hui, KE Xin-meng, Et al., A new method to identify bridge bearing damage based on radial basis function neural network, Earthquakes and Structures, 11, 5, pp. 841-859, (2016)
- [16] ZENG Zhi-ping, LIU Fu-shan, WANG Wei-dong, Three-dimensional train-track-bridge coupled dynamics model based on the explicit finite element method, Soil Dynamics and Earthquake Engineering, 153, (2022)
- [17] YAU J D., Response of a train moving on multi-span railway bridges undergoing ground settlement, Engineering Structures, 31, 9, pp. 2115-2122, (2009)
- [18] ZHOU Wang-bao, NIE Lei-xin, JIANG Li-zhong, Et al., Mapping relation between pier settlement and rail deformation of unit slab track system, Structures, 27, pp. 1066-1074, (2020)
- [19] ZHU Li, WANG Jia-ji, LI Xuan, Et al., Experimental and numerical study on creep and shrinkage effects of ultra high-performance concrete beam, Composites Part B: Engineering, 184, (2020)
- [20] GAYARRE F L, GONZALEZ J S, PEREZ C L C, Et al., Shrinkage and creep in structural concrete with recycled brick aggregates, Construction and Building Materials, 228, (2019)