共 50 条
- [41] Optimal location of workstations in tandem automated-guided vehicle systems [J]. The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1429 - 1438
- [42] Optimal location of workstations in tandem automated-guided vehicle systems [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (9-12): : 1429 - 1438
- [44] Scheduling Problems of Automated Guided Vehicles in Job Shop, Flow Shop, and Container Terminals [J]. 2017 4TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2017, : 60 - 65
- [46] Deadlock prevention for automated guided vehicles in automated container terminals [J]. OR Spectrum, 2006, 28 : 659 - 679
- [50] DESIGN OF OPTIMAL FEEDBACK-SYSTEMS FOR LONGITUDINAL CONTROL OF AUTOMATED TRANSIT VEHICLES [J]. TRANSPORTATION RESEARCH, 1973, 7 (02): : 125 - 144