A novel model for multi-plant mixed heavy crude oils refinery planning

被引:1
|
作者
Huang, Xiaoqiao [1 ]
Hu, Yangdong [2 ]
Song, Lijuan [1 ,3 ]
Zhang, Yuzhen [1 ]
Chen, Dongkui [4 ]
机构
[1] China Univ Petr East China, Coll Chem Engn, Qingdao 266100, Peoples R China
[2] Ocean Univ China, Coll Chem & Chem Engn, Qingdao 266100, Peoples R China
[3] Liaoning Shihua Univ, Liaoning Key Lab Petrochem Engn, Fushun 113001, Peoples R China
[4] PetroChina Qinhuangdao Fuel Oil Asphalt Co Ltd, Qinhuangdao 066000, Peoples R China
关键词
Heavy crude; Mixing ratio; Multi-plant; Optimization; Planning;
D O I
10.1016/j.cjche.2016.07.017
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In this paper, multi-refinery using the same heavy crude oils as raw materials is studied, while a new nonlinear model for mixed heavy crude distillation is proposed. In practical crude distillation operation, the distillate yield and product distribution of distillation units are different due to their various equipment and operating parameters, even the same ratio of raw materials is provided, so different process models for multi-refinery planning is therefore required. For process modeling, the relationships between total yields and mixing ratio of different refineries were determined, which is combined with process simulation using production data. Then, the yields and properties of crude distillation unit (CDU) fractions were calculated with the use of true boiling point (TBP) curves and property curves respectively when the initial cutting temperatures were given. Finally, in order to maximize the economic benefit of distillation, the optimal product distribution and the best mixing ratio of crude oilwere calculated under the constraints of different properties of fractions. Comparing to previous models, the proposed model takes the influence of different refinery parameters on production process into account, while avoiding the complex process for determining the cutting points, which is considered more efficient and more accurate with respect to heavy crude refinery. Model was successfully verified by a case study, allowing a significant improvement of the refinery profit to be achieved. (C) 2016 The Chemical Industry and Engineering Society of China, and Chemical Industry Press. All rights reserved.
引用
收藏
页码:202 / 210
页数:9
相关论文
共 50 条
  • [11] NOVEL AROMATIC BIOMARKERS IN HEAVY CRUDE OILS
    LU, SN
    LI, WM
    HE, W
    WANG, JR
    SHI, JY
    KEXUE TONGBAO, 1988, 33 (02): : 143 - 148
  • [12] NOVEL AROMATIC BIOMARKERS IN HEAVY CRUDE OILS
    卢松年
    李伟民
    何炜
    汪建蓉
    史继扬
    ScienceBulletin, 1988, (02) : 143 - 148
  • [13] Multi-plant firms and the heavy tail of firm size distribution
    Chakrabarti, Anindya S.
    Tomar, Shekhar
    CANADIAN JOURNAL OF ECONOMICS-REVUE CANADIENNE D ECONOMIQUE, 2024, 57 (03): : 1028 - 1041
  • [14] Crude oil property and contaminant characterization and tracking in the modern heavy oils refinery
    Ohmes, Robert A.
    Sayles, Scott
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2011, 242
  • [15] A deterministic model for planning production quantities in a multi-plant, multi-warehouse environment with extensible capacities
    Jolayemi, JK
    Olorunniwo, FO
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 87 (02) : 99 - 113
  • [16] Multi-plant assembly planning models for a collaborative manufacturing environment
    Tseng, Y.-J.
    Jhang, J.-F.
    Huang, F.-Y.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (15) : 3333 - 3349
  • [17] Evolutionary algorithm for advanced process planning and scheduling in a multi-plant
    Moon, C
    Seo, Y
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (02) : 311 - 325
  • [18] An order decision and production planning integrated available-to-promise model for multi-plant manufacturing
    Wang, Wen-Hao
    Zhang, Jie
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2011, 45 (12): : 1794 - 1799
  • [19] Stochastic modelling and optimisation of multi-plant capacity planning problem
    Verma, Anoop
    Shukla, Nagesh
    Tyagi, Satish
    Mishra, Nishikant
    INTERNATIONAL JOURNAL OF INTELLIGENT ENGINEERING INFORMATICS, 2014, 2 (2-3) : 139 - 165
  • [20] A multi-plant production planning model considering non-repeated setup and aperiodic shipment
    Shen, Guangya
    Luo, Kaiping
    Li, Liheng
    JOURNAL OF MANUFACTURING SYSTEMS, 2020, 57 (57) : 451 - 459