Interpretive Structural Model-based for Analysis of Causes of Delays in Construction Projects: The Portuguese Case

被引:2
|
作者
Arantes, Amilcar [1 ]
Ferreira, Luis Miguel D. F. [2 ]
机构
[1] Univ Lisbon, Inst Super Tecn, CERIS, CESUR, Av Rovisco Pais, P-1049001 Lisbon, Portugal
[2] Univ Coimbra, Dept Mech Engn, CEMMPRE, Polo 2,Rua Luis Reis Santos, P-3030788 Coimbra, Portugal
关键词
Construction Delays; Construction Industry; Project Management; Interpretive Structural Modelling;
D O I
10.5220/0010315303660374
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Delays are a common issue in construction projects worldwide, and they can frequently have an influence on time and cost overruns, among other problems. This study aims to add to the knowledge on construction project management theory and practice by identifying the leading causes of Delays in Construction Projects (DCP) in Portugal, modeling their interrelationships, and determining their main causes. The study presented herein adopted a two-phase methodology. First, based on the literature, the causes of DCP in Portugal are identified. Then the hierarchical structure of the causes of DCP is determined, using integrated Interpretive Structural Modelling (ISM), and an ISM-based Model is developed. The results show that the 16 causes of DCP taken into consideration are hierarchized in six different influence levels. The causes Bidding and contract award process and Lack of communication between parties are the most influential causes, and are thus considered to be the root causes of DCP in Portugal. Additionally, the results show that the causes of DCP can be divided into four different categories relating to Relationships and contract, Material, the Developer, and the Contractor. Finally, these results provide fundamental insights for practitioners and researchers to develop effective measures to mitigate the causes of DCP.
引用
收藏
页码:366 / 374
页数:9
相关论文
共 50 条
  • [41] An algorithm based on structural analysis for model-based fault diagnosis
    Gelso, Esteban R.
    Castillo, Sandra M.
    Armengol, Joaquim
    [J]. ARTIFICIAL INTELLIGENCE RESEARCH AND DEVELOPMENT, 2008, 184 : 138 - +
  • [42] COMMON CAUSES OF CONFLICTS IN CONSTRUCTION PROJECTS - COMPARATIVE ANALYSIS OF PROJECTS IN LIBYA AND SERBIA
    Elmabrok, Elmagdobi M.
    Nikola, Culic
    Dejan, Beljakovic
    Aleksandar, Milajic
    Goran, Pejicic
    [J]. ARCHIVES FOR TECHNICAL SCIENCES, 2016, (15): : 33 - 40
  • [43] A MODEL FOR EVALUATING CAUSES OF WASTES AND LEAN IMPLEMENTATION IN CONSTRUCTION PROJECTS
    Issa, Usama Hamed
    Alqurashi, Muwaffaq
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (04) : 331 - 342
  • [44] Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects
    Tavakolan, Mehdi
    Etemadinia, Hannaneh
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (11)
  • [45] Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model
    Hong Anh Vu
    Viet Hung Cu
    Min, Lian Xing
    Wang, Jian Qiong
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (06) : 1018 - 1039
  • [46] Assessment of Causes of Delays in the Road Construction Projects in the Benin Republic Using Fuzzy PIPRECIA Method
    Stevic, Zeljko
    Bouraima, Mouhamed Bayane
    Subotic, Marko
    Qiu, Yanjun
    Buah, Peter Antwi
    Ndiema, Kevin Maraka
    Ndjegwes, Christian Magloire
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [47] Causes-Effects Relationship of Construction Project Delays in Ghana: Focusing on Local Government Projects
    Ametepey, Simon Ofori
    Gyadu-Asiedu, William
    Assah-Kissiedu, Millicent
    [J]. ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE (AHFE 2017), 2018, 600 : 84 - 95
  • [48] Model-Based Conditional Weighted Residuals Analysis for Structural Model Assessment
    Moustafa M. A. Ibrahim
    Sebastian Ueckert
    Svetlana Freiberga
    Maria C. Kjellsson
    Mats O. Karlsson
    [J]. The AAPS Journal, 21
  • [49] An Investigation into the Causes of Payment Delays and Deliberate Delay Tactics in Public Construction Projects in Saudi Arabia
    Bageis, Abdulrahman Salem
    [J]. BUILDINGS, 2024, 14 (06)
  • [50] Model-Based Conditional Weighted Residuals Analysis for Structural Model Assessment
    Ibrahim, Moustafa M. A.
    Ueckert, Sebastian
    Freiberga, Svetlana
    Kjellsson, Maria C.
    Karlsson, Mats O.
    [J]. AAPS JOURNAL, 2019, 21 (03):