Interpretive Structural Model-based for Analysis of Causes of Delays in Construction Projects: The Portuguese Case

被引:2
|
作者
Arantes, Amilcar [1 ]
Ferreira, Luis Miguel D. F. [2 ]
机构
[1] Univ Lisbon, Inst Super Tecn, CERIS, CESUR, Av Rovisco Pais, P-1049001 Lisbon, Portugal
[2] Univ Coimbra, Dept Mech Engn, CEMMPRE, Polo 2,Rua Luis Reis Santos, P-3030788 Coimbra, Portugal
关键词
Construction Delays; Construction Industry; Project Management; Interpretive Structural Modelling;
D O I
10.5220/0010315303660374
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Delays are a common issue in construction projects worldwide, and they can frequently have an influence on time and cost overruns, among other problems. This study aims to add to the knowledge on construction project management theory and practice by identifying the leading causes of Delays in Construction Projects (DCP) in Portugal, modeling their interrelationships, and determining their main causes. The study presented herein adopted a two-phase methodology. First, based on the literature, the causes of DCP in Portugal are identified. Then the hierarchical structure of the causes of DCP is determined, using integrated Interpretive Structural Modelling (ISM), and an ISM-based Model is developed. The results show that the 16 causes of DCP taken into consideration are hierarchized in six different influence levels. The causes Bidding and contract award process and Lack of communication between parties are the most influential causes, and are thus considered to be the root causes of DCP in Portugal. Additionally, the results show that the causes of DCP can be divided into four different categories relating to Relationships and contract, Material, the Developer, and the Contractor. Finally, these results provide fundamental insights for practitioners and researchers to develop effective measures to mitigate the causes of DCP.
引用
收藏
页码:366 / 374
页数:9
相关论文
共 50 条
  • [1] Causes of delays in construction projects: A statistical analysis and model
    Zhao, Zhen Yu
    Liu, Rui
    Ning, Qing
    [J]. PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 944 - 952
  • [2] Causes of Construction Projects Delays: A qualitative analysis
    Rudeli, N.
    Viles, E.
    Gonzalez, J.
    Santilli, A.
    [J]. MEMORIA INVESTIGACIONES EN INGENIERIA, 2018, (16): : 71 - 84
  • [3] Delays in construction projects - Causes and impacts
    Arantes, Amlcar
    da Silva, Pedro Fernandez
    Ferreira, Luis Miguel D. F.
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1105 - 1110
  • [4] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69
  • [5] CAUSES OF DELAYS IN CONSTRUCTION PROJECTS IN TURKEY
    Kazaz, Aynur
    Ulubeyli, Serdar
    Tuncbilekli, Nihan Avcioglu
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (03) : 426 - 435
  • [6] Construction projects: interactions of the causes of delays
    Purushothaman, Mahesh Babu
    San Pedro, Leo Neil Resurreccion
    GhaffarianHoseini, Ali
    [J]. SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [7] Causes and Impacts of Delays in Ethiopian Public Construction Projects (Case on Debre Markos University Construction Projects)
    Demissew, Abebe
    Abiy, Fasika
    [J]. ADVANCES IN CIVIL ENGINEERING, 2023, 2023
  • [8] Exploring the Causes of Design Changes in Building Construction Projects: An Interpretive Structural Modeling Approach
    Shoar, Shahab
    Chileshe, Nicholas
    [J]. SUSTAINABILITY, 2021, 13 (17)
  • [9] Causes of delays on construction projects: a comprehensive list
    Durdyev, Serdar
    Hosseini, M. Reza
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 20 - 46
  • [10] Causes of schedule delays in construction projects in Algeria
    Rachid, Zemra
    Toufik, Boudouh
    Mohammed, Baheddi
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) : 371 - 381