共 50 条
- [42] Requirements for Sales and Operations Planning in an Engineer-to-Order Manufacturing Environment [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, APMS 2021, PT IV, 2021, 633 : 371 - 380
- [43] Analysis of the Waiting Time Effects on the Financial Return and the Order Fulfillment in Web-based Group Buying Mechanisms [J]. 2009 IEEE/WIC/ACM INTERNATIONAL JOINT CONFERENCES ON WEB INTELLIGENCE (WI) AND INTELLIGENT AGENT TECHNOLOGIES (IAT), VOL 1, 2009, : 663 - 666
- [44] An Improved Online Return Management with a Photo-Enabled Order Tracking System [J]. 2019 INTERNATIONAL COLLOQUIUM ON LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA), 2019,
- [47] Dynamic real-time order promising and fulfillment for make-to-order company in supply chain environment (ID: 1-032) [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-5: INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION IN NEW-ERA, 2006, : 344 - 349
- [49] Increasing the Practical Applicability of Order Picking Operations by Integrating Classification, Labelling and Packaging Regulations [J]. COMPUTATIONAL LOGISTICS, ICCL 2020, 2020, 12433 : 733 - 746
- [50] A Three Steps Methodological Approach to Assess the Engineer-to-Order Operations Environment [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: THE PATH TO INTELLIGENT, COLLABORATIVE AND SUSTAINABLE MANUFACTURING, 2017, 514 : 251 - 258