Determination of Reasonable Width of Filling Body for Gob-Side Entry Retaining in Mining Face with Large Cutting Height

被引:0
|
作者
Pu, Shijiang [1 ]
Wu, Guiyi [2 ]
Liu, Qinzhi [2 ]
Wang, Yuliang [2 ]
Li, Qiang [2 ]
Xiong, Yu [2 ]
机构
[1] Kunming Univ Sci & Technol, Fac Land Resources Engn, Kunming 650093, Yunnan, Peoples R China
[2] Guizhou Univ, Min Coll, Guiyang 550025, Guizhou, Peoples R China
基金
中国国家自然科学基金;
关键词
STABILITY ANALYSIS; ROOF; ROCK;
D O I
10.1155/2022/1774110
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
When gob-side entry retaining is adopted in the mining face with large cutting height, due to large stope space, strong dynamic pressure, and other reasons, the filling body is usually broken and unstable due to improper width of filling body, and the stability of surrounding rock of a roadway is poor. Taking the actual project of Shaqu mine as the background, we analyze the stability factors of gob-side entry retaining with large mining height, and considering the lateral pressure and overlying load on the filling body, the mechanical model of a gob-side retaining roadway is established, the calculation method of the reserved width of the filling body is simplified, and the reasonable width of the filling body is obtained quantitatively. Through the monitoring results of numerical simulation and field test, the rationality of the calculation results of the reserved width of filling body is verified. The results show that if the width of the filling body is too small, it will not be able to bear the load of the overlying strata, resulting in the fragmentation of the filling body. The larger the width of the filling body, the greater the cutting resistance provided, which can reduce timely the stress on the roadway and above the filling body, and the more stable the retaining roadway is, but when the width increases to a certain value, the displacement of the surrounding rock of the roadway has changed little. When the width of the filling body is 4 m, the stability of gob-side entry retaining can be guaranteed.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] The gob-side entry retaining with the high-water filling material in Xin'an Coal Mine
    Li, Tan
    Chen, Guangbo
    Qin, Zhongcheng
    Li, Qinghai
    Cao, Bin
    Liu, Yongle
    [J]. GEOMECHANICS AND ENGINEERING, 2020, 22 (06) : 541 - 552
  • [42] Design of coal pillars of gob-side entry between mining faces with large differences in mining height in deep mine
    Qi, Wenyue
    Zhang, Qiang
    Zhang, Jixiong
    Zhang, Jianguo
    Zhu, Cunli
    [J]. ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2020, 42 (21) : 2648 - 2663
  • [43] The stability of key block and calculating the width of roadside backfill in a secondary gob-side entry retaining
    Li, Ying-Fu
    Hua, Xin-Zhu
    [J]. Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2012, 29 (06): : 783 - 789
  • [44] Characteristics of overburden failure and fracture development in gob of mining with gob-side entry formed by cutting roof
    Liu, Hongwei
    Zhao, Yangsheng
    Ren, Tingxiang
    Wang, Fei
    Li, Zhigang
    [J]. Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2022, 51 (01): : 77 - 89
  • [45] Engineering experimentation of gob-side entry retaining formed by roof cutting and pressure release in a thick-seam fast-extracted mining face
    He Man-chao
    Gao Yu-bing
    Yang Jun
    Wang Jian-wen
    Wang Ya-jun
    Zhu Zhen
    [J]. ROCK AND SOIL MECHANICS, 2018, 39 (01) : 254 - 264
  • [46] Distribution and Evolution Characteristics of Macroscopic Stress Field in Gob-Side Entry Retaining by Roof Cutting
    Zhen Zhu
    Chun Zhu
    Hongping Yuan
    [J]. Geotechnical and Geological Engineering, 2019, 37 : 2963 - 2976
  • [47] Novel Application of the Roof-Cutting-Type Gob-Side Entry Retaining in Coal Mine
    Wang, Jiong
    Li, Wenfei
    Zhu, Daoyong
    Gong, Weili
    Su, Yi
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [48] Mechanical Model and Control Technology of Roadside Gangues in Gob-Side Entry Retaining by Roof Cutting
    Zhen Zhu
    Manchao He
    Xuchun Wang
    Hongping Yuan
    [J]. Geotechnical and Geological Engineering, 2020, 38 : 849 - 860
  • [49] Distribution and Evolution Characteristics of Macroscopic Stress Field in Gob-Side Entry Retaining by Roof Cutting
    Zhu, Zhen
    Zhu, Chun
    Yuan, Hongping
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 2963 - 2976
  • [50] Mechanical Model and Control Technology of Roadside Gangues in Gob-Side Entry Retaining by Roof Cutting
    Zhu, Zhen
    He, Manchao
    Wang, Xuchun
    Yuan, Hongping
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (01) : 849 - 860