A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers

被引:72
|
作者
Sambasivan, M [1 ]
Yahya, S [1 ]
机构
[1] Univ Putra Malaysia, Grad Sch Management, Serdang, Selangor, Malaysia
关键词
capacitated lot sizing; Lagrangean-based heuristic; multi-plant production planning;
D O I
10.1016/j.cor.2003.08.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses scheduling of lot sizes in a multi-plant, multi-item, multi-period, capacitated environment with inter-plant transfers. A real-world problem in a company manufacturing steel rolled products provided motivation to this research. A Lagrangean-based approach, embedded with a lot shifting-splitting-merging routine, has been used for solving the multi-plant, capacitated lot-sizing problem. A "good" solution procedure developed by Sambasivan (Ph.D. Dissertation, University of Alabama, Tuscaloosa, 1994) has been used for solving the relaxed problem. About 120 randomly generated instances of the problem have been solved and it has been found that Lagrangean-based approach works quite "efficiently" for this problem. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:537 / 555
页数:19
相关论文
共 50 条