Barriers to BIM Implementation in Architecture, Construction, and Engineering Projects-The Polish Study

被引:52
|
作者
Lesniak, Agnieszka [1 ]
Gorka, Monika [1 ]
Skrzypczak, Izabela [2 ]
机构
[1] Cracow Univ Technol, Fac Civil Engn, PL-31155 Krakow, Poland
[2] Rzeszow Univ Technol, Fac Civil & Environm Engn & Architecture, PL-35082 Rzeszow, Poland
关键词
building information modeling (BIM); building energy model (BEM); architecture; engineering; and construction (AEC) projects; barriers; Ishikawa diagram; INFORMATION MODELING BIM; MANAGEMENT-SYSTEM; DESIGN;
D O I
10.3390/en14082090
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
BIM (building information modeling) is a kind of technology that has great potential to enhance the level of automation in architecture, engineering, and construction (AEC) projects. The created virtual model of the facility allows coordinating all industries during the entire life cycle of the building. The possibility to save the data related to the given facility in one place, namely in the BIM model, enables control and management of the AEC projects at every stage. During the design and implementation phase, BIM models facilitate the optimization of time, costs, and quality, and in the operational phase, they support effective management of the facility. The use of BIM for building energy modeling (BEM) is the next step of evolution in architecture and engineering design practice. The benefits of using the BIM approach are widely discussed in the literature; however, they may be hard to achieve if appropriate attention is not directed to minimizing the barriers to the implementation of this technology. Observing Europe, one can notice that western and northern countries successfully use BIM for their needs, while the countries of the Eastern Bloc, including Poland, introduce it at a slower pace. In the present paper, the authors conducted a cause-and-effect analysis of the identified barriers to the implementation of BIM technology in the construction process. For this purpose, the authors applied the Ishikawa diagram, which is a tool that helps to recognize the actual or potential causes of failure. The analysis conducted showed that one of the weakest links in the successful BIM implementation is people and, in particular, their lack of knowledge and reluctance to change. The authors indicated the need to introduce and strengthen preventive actions, mainly through education: training, courses, and studies focused on BIM technology.
引用
收藏
页数:20
相关论文
共 50 条
  • [22] An Empirical Analysis of Barriers to Building Information Modelling (BIM) Implementation in Wood Construction Projects: Evidence from the Swedish Context
    Gharaibeh, Lina
    Matarneh, Sandra T.
    Eriksson, Kristina
    Lantz, Bjorn
    BUILDINGS, 2022, 12 (08)
  • [23] BIM divide: an international comparative analysis of perceived barriers to implementation of BIM in the construction industry
    Saka, Abdullahi Babatunde
    Chan, Daniel W. M.
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023, 21 (05) : 1604 - 1632
  • [24] Empirical Analysis of Critical Success Factors for Mechatronics Implementation in Architecture, Engineering, Construction and Operations Projects in Nigeria
    Oke, Ayodeji Emmanuel
    Aliu, John
    Ekundayo, Damilola
    Oni, Samuel Bankole
    Ilesanmi, Oluwadamilare Olamide
    Aghimien, Douglas Omoregie
    Aigbavboa, Clinton
    BUILDINGS, 2024, 14 (11)
  • [25] Challenges to the Implementation of Building Information Modeling (BIM) for Sustainable Construction Projects
    Kineber, Ahmed Farouk
    Othman, Idris
    Famakin, Ibukun O. O.
    Oke, Ayodeji Emmanuel
    Hamed, Mohammed Magdy
    Olayemi, Taiwo Matthew
    APPLIED SCIENCES-BASEL, 2023, 13 (06):
  • [26] Barriers to Building Information Modeling (BIM) Deployment in Small Construction Projects: Malaysian Construction Industry
    Waqar, Ahsan
    Qureshi, Abdul Hannan
    Alaloul, Wesam Salah
    SUSTAINABILITY, 2023, 15 (03)
  • [27] Adoption and Implementation of BIM in Canadian Construction Projects: Benefits, Challenges, and Limitations
    Moazzami, Mohammad
    Maalek, Reza
    Senanayake, Sanuj A.
    Ruwanpura, Janaka
    CONSTRUCTION RESEARCH CONGRESS 2020: COMPUTER APPLICATIONS, 2020, : 1 - 10
  • [28] The Relationship Between BIM Implementation and Individual Level Collaboration in Construction Projects
    Ozturk, Gozde Basak
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [29] Drivers of Innovation Using BIM in Architecture, Engineering, and Construction Firms
    Villena, Francisco
    Garcia-Segura, Tatiana
    Pellicer, Eugenio
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 210 - 222
  • [30] BIM-Based Research Framework for Sustainable Building Projects: A Strategy for Mitigating BIM Implementation Barriers
    Manzoor, Bilal
    Othman, Idris
    Gardezi, Syed Shujaa Safdar
    Altan, Hasim
    Abdalla, Salem Buhashima
    APPLIED SCIENCES-BASEL, 2021, 11 (12):