Barriers to BIM Implementation in Architecture, Construction, and Engineering Projects-The Polish Study

被引:52
|
作者
Lesniak, Agnieszka [1 ]
Gorka, Monika [1 ]
Skrzypczak, Izabela [2 ]
机构
[1] Cracow Univ Technol, Fac Civil Engn, PL-31155 Krakow, Poland
[2] Rzeszow Univ Technol, Fac Civil & Environm Engn & Architecture, PL-35082 Rzeszow, Poland
关键词
building information modeling (BIM); building energy model (BEM); architecture; engineering; and construction (AEC) projects; barriers; Ishikawa diagram; INFORMATION MODELING BIM; MANAGEMENT-SYSTEM; DESIGN;
D O I
10.3390/en14082090
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
BIM (building information modeling) is a kind of technology that has great potential to enhance the level of automation in architecture, engineering, and construction (AEC) projects. The created virtual model of the facility allows coordinating all industries during the entire life cycle of the building. The possibility to save the data related to the given facility in one place, namely in the BIM model, enables control and management of the AEC projects at every stage. During the design and implementation phase, BIM models facilitate the optimization of time, costs, and quality, and in the operational phase, they support effective management of the facility. The use of BIM for building energy modeling (BEM) is the next step of evolution in architecture and engineering design practice. The benefits of using the BIM approach are widely discussed in the literature; however, they may be hard to achieve if appropriate attention is not directed to minimizing the barriers to the implementation of this technology. Observing Europe, one can notice that western and northern countries successfully use BIM for their needs, while the countries of the Eastern Bloc, including Poland, introduce it at a slower pace. In the present paper, the authors conducted a cause-and-effect analysis of the identified barriers to the implementation of BIM technology in the construction process. For this purpose, the authors applied the Ishikawa diagram, which is a tool that helps to recognize the actual or potential causes of failure. The analysis conducted showed that one of the weakest links in the successful BIM implementation is people and, in particular, their lack of knowledge and reluctance to change. The authors indicated the need to introduce and strengthen preventive actions, mainly through education: training, courses, and studies focused on BIM technology.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] A study on BIM implementation of construction projects for PCM during the construction phase
    Lin Y.-C.
    Lin C.-P.
    Shueh T.-S.
    Hu H.-T.
    Journal of the Chinese Institute of Civil and Hydraulic Engineering, 2020, 32 (02): : 239 - 250
  • [2] BIM in the construction process - selected problems at the stage of implementation in Polish road engineering
    Juszczyk, Artur
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (01) : 623 - 633
  • [3] Implementation of BIM Virtual Models in Industry for the Graphical Coordination of Engineering and Architecture Projects
    Fernandez Rodriguez, Juan Francisco
    BUILDINGS, 2023, 13 (03)
  • [4] BIM Use by Architecture, Engineering, and Construction (AEC) Industry in Educational Facility Projects
    Moreno, Cristina
    Olbina, Svetlana
    Issa, Raja R.
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [5] Modelling paths of risks associated with BIM implementation in architectural, engineering and construction projects
    Zhao, Xianbo
    Feng, Yingbin
    Pienaar, Josua
    O'Brien, Darryl
    ARCHITECTURAL SCIENCE REVIEW, 2017, 60 (06) : 472 - 482
  • [6] Barriers to modular construction systems implementation in developing countries' architecture, engineering and construction industry
    Bello, Abdulkabir Opeyemi
    Khan, Ayaz Ahmad
    Idris, Abdullahi
    Awwal, Hamzat Mohammed
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (08) : 3148 - 3164
  • [7] Technology Transfer in Construction Engineering Joint Venture Projects-The Case of South Africa
    Rwelamila, P. D.
    Mkandawire, S.
    LISS 2014, 2015, : 1203 - 1208
  • [8] Management of the Organizational and Contractual Risks of BIM Projects in the Architecture, Engineering and Construction Industry (AEC)
    Barakeh, Kamal
    Almarri, Khalid
    PROCEEDINGS OF 3RD INTERNATIONAL SUSTAINABLE BUILDINGS SYMPOSIUM (ISBS 2017), VOL 1, 2018, 6 : 717 - 735
  • [9] THE ANALYSIS OF BARRIERS TO BIM IMPLEMENTATION FOR INDUSTRIALIZED BUILDING CONSTRUCTION: A CHINA STUDY
    Wu, Ping
    Jin, Ruoyu
    Xu, Yidong
    Lin, Feng
    Dong, Yiting
    Pan, Zhihong
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2021, 27 (01) : 1 - 13
  • [10] Enablers and Barriers of Lean Implementation in Construction Projects
    Bayhan, Hasan Gokberk
    Demirkesen, Sevilay
    Jayamanne, Eshan
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471