Modeling and analysis for determining optimal suppliers under stochastic lead times

被引:15
|
作者
Abginehchi, Soheil [2 ]
Farahani, Reza Zanjirani [1 ,3 ]
机构
[1] Amir Kabir Univ Technol, Dept Ind Engn, Ctr Maritime Studies, Tehran, Iran
[2] Univ Aarhus, Aarhus Sch Business, Dept Business Studies, CORAL Res Grp, DK-8210 Aarhus V, Denmark
[3] Natl Univ Singapore, Ctr Maritime Studies, Singapore 117548, Singapore
关键词
Order splitting; Inventory; Supply chain; Multiple sourcing; Random lead-time; INVENTORY MODEL; STOCK-CONTROL; ORDER; SOLE; REDUCTION; RISK;
D O I
10.1016/j.apm.2009.08.021
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The policy of simultaneously splitting replenishment orders among several suppliers has received considerable attention in the last few years and continues to attract the attention of researchers. In this paper, we develop a mathematical model which considers multiple-supplier single-item inventory systems. The item acquisition lead times of suppliers are random variables. Backorder is allowed and shortage cost is charged based on not only per unit in shortage but also per time unit. Continuous review (s,Q) policy has been assumed. When the inventory level depletes to a reorder level, the total order is split among n suppliers. Since the suppliers have different characteristics, the quantity ordered to different suppliers may be different. The problem is to determine the reorder level and quantity ordered to each supplier so that the expected total cost per time unit, including ordering cost, procurement cost, inventory holding cost, and shortage cost, is minimized. We also conduct extensive numerical experiments to show the advantages of our model compared with the models in the literature. According to our extensive experiments, the model developed in this paper is the best model in the literature which considers order splitting for n-supplier inventory systems since it is the nearest model to the real inventory system. (C) 2009 Elsevier Inc. All rights reserved.
引用
收藏
页码:1311 / 1328
页数:18
相关论文
共 50 条
  • [21] Inventory Management with Stochastic Lead Times
    Muthuraman, Kumar
    Seshadri, Sridhar
    Wu, Qi
    MATHEMATICS OF OPERATIONS RESEARCH, 2015, 40 (02) : 302 - 327
  • [22] An optimal inventory strategy under stochastic demands and variable lead time
    Huang, Yun-Cheng
    Tsao, Chun-Ming
    Journal of Technology, 2015, 30 (03): : 205 - 222
  • [23] The determination of the optimal number of suppliers under risk
    Liu, Donglin
    Wang, Chunxiang
    Fifth Wuhan International Conference on E-Business, Vols 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT, 2006, : 2061 - 2065
  • [24] Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times
    Altendorfer, Klaus
    Minner, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 243 (02) : 555 - 565
  • [25] The impact of stochastic lead times on the bullwhip effect
    Zhang, Yidan
    Sima, Kefei
    Chen, Jingxian
    PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 2977 - 2982
  • [26] DYNAMIC INVENTORY MODEL WITH STOCHASTIC LEAD TIMES
    KAPLAN, RS
    MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (07): : 491 - 507
  • [27] Determining optimal inland-empty-container depot locations under stochastic demand
    Mittal, Neha
    Boile, Maria
    Baveja, Alok
    Theofanis, Sotiris
    RESEARCH IN TRANSPORTATION ECONOMICS, 2013, 42 : 50 - 60
  • [28] Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint
    Louly, Mohamed-Aly
    Dolgui, Alexandre
    Al-Ahmari, Abdulrahman
    JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (06) : 2485 - 2495
  • [29] Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint
    Mohamed-Aly Louly
    Alexandre Dolgui
    Abdulrahman Al-Ahmari
    Journal of Intelligent Manufacturing, 2012, 23 : 2485 - 2495
  • [30] Optimal Supply Planning for Two-Levels Assembly System with Stochastic Lead Times and Maintenance Actions
    Guiras, Z.
    Turki, S.
    Rezg, N.
    Dolgui, A.
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 551 - 556