Assessment of performance indices of selected gas turbine power plants in Nigeria

被引:11
|
作者
Oyedepo, Sunday Olayinka [1 ]
Fagbenle, Richard Olayiwola [2 ]
Adefila, Samuel Sunday [3 ]
机构
[1] Covenant Univ, Dept Mech Engn, Ota, Nigeria
[2] Obafemi Awolowo Univ, Dept Mech Engn, Ife, Nigeria
[3] Covenant Univ, Dept Chem Engn, Ota, Nigeria
来源
ENERGY SCIENCE & ENGINEERING | 2015年 / 3卷 / 03期
关键词
Availability; electricity; performance indices; plant factor; power plant; reliability; RELIABILITY;
D O I
10.1002/ese3.61
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In this study, performance assessment of selected gas turbine power plants in Nigeria was evaluated using performance indices. The results of the study showed that for the period under review (2006-2010), the percentage shortfalls from the target energy in the selected power plants range from 26.33% to 86.61% as against the acceptable value of 5-10%. The capacity factor of the selected power plants varies from 16.88% to 73.67% as against the international value of 50-80%. The plant use factor varies from 45.89% to 97.03% and the utilization factor varies from 6.31% to 93.074% as against the international best practice of over 95%. From this result, it can be concluded that the generating units were underutilized. This is due to inadequate routine maintenance and equipment fault development. The analyses of reliability indicators revealed that the mean time between failures varies from 5.42 to 378.44 h, the mean time to repair varies from 18.3 to 153.88 h and the plant availability varies from 12.86% to 91.31% as against the Institute of Electrical and Electronics Engineers recommended standard of 99.9%. Evaluation of operating figures of the selected power plants revealed that starting reliability (SR) and operating reliability vary from 71.95% to 93.9% and 5.33% to 55%, respectively. The SR of the selected power plants is low in value compared with standard value of 99.9%. The statistical analysis carried out on plant availability revealed that at 95% confidence level; there is a significant difference in availability of the selected power plants. This indicates differences in their systems installation, operation and maintenance. The performance indicator developed to evaluate the performance indices for the selected stations can also be applicable to other power stations in Nigeria and elsewhere. Measures to improve the performance indices of the plants have been suggested in this paper.
引用
收藏
页码:239 / 256
页数:18
相关论文
共 50 条
  • [1] Exergoenvironomic modelling and performance assessment of selected gas turbine power plants
    Oyedepo, Sunday Olayinka
    Fagbenle, Richard Olayiwola
    Adefila, Samuel Sunday
    Alam, Md Mahbub
    WORLD JOURNAL OF ENGINEERING, 2016, 13 (02) : 149 - 162
  • [2] Exergoeconomic analysis and performance assessment of selected gas turbine power plants
    Oyedepo, S. O.
    Fagbenle, R. O.
    Adefila, S. S.
    Alam, Md. Mahbub
    WORLD JOURNAL OF ENGINEERING, 2015, 12 (03) : 283 - 300
  • [3] Performance evaluation of selected gas turbine power plants in Nigeria using energy and exergy methods
    Oyedepo, S. O.
    Fagbenle, R. O.
    Adefila, S. S.
    Alam, M. M.
    WORLD JOURNAL OF ENGINEERING, 2015, 12 (02) : 161 - 176
  • [4] EXERGY, EXERGOECONOMIC AND EXERGOENVIRONOMIC ANALYSES OF SELECTED GAS TURBINE POWER PLANTS IN NIGERIA
    Fagbenle, Richard Olayiwola
    Adefila, Sunday Sam
    Oyedepo, Sunday
    Odunfa, Moradeyo
    ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2014, VOL 6B, 2015,
  • [5] Thermoeconomic and thermoenvironomic modeling and analysis of selected gas turbine power plants in Nigeria
    Oyedepo, Sunday O.
    Fagbenle, Richard O.
    Adefila, Samuel S.
    Alam, Md. Mahbub
    ENERGY SCIENCE & ENGINEERING, 2015, 3 (05) : 423 - 442
  • [6] Exergy costing analysis and performance evaluation of selected gas turbine power plants
    Oyedepo, S. O.
    Fagbenle, R. O.
    Adefila, S. S.
    Alam, Md. Mahbub
    COGENT ENGINEERING, 2015, 2 (01):
  • [7] Technical and Economic Performance Indices of Promising Peak-Load Gas Turbine Power Plants.
    Gel'tman, A.E.
    Il'ina, L.V.
    Efimov, V.S.
    1978, (09): : 33 - 35
  • [8] Performance evaluation and economic analysis of a gas turbine power plant in Nigeria
    Oyedepo, S. O.
    Fagbenle, R. O.
    Adefila, S. S.
    Adavbiele, S. A.
    ENERGY CONVERSION AND MANAGEMENT, 2014, 79 : 431 - 440
  • [9] Performance of gas turbine power plants controlled by multiagent scheme
    Dambrosio, Lorenzo
    Mastrovito, Marco
    Camporeale, Sergio M.
    PROCEEDINGS OF THE ASME TURBO EXPO 2006, VOL 2, 2006, : 655 - 662
  • [10] Impact of Fuels on Performance and Efficiency of Gas Turbine Power Plants
    Basha, Mehaboob
    Shaahid, S. M.
    Al-Hadhrami, Luai
    2011 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY ENGINEERING (ICAEE), 2012, 14 : 558 - 565