Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows

被引:145
|
作者
Stadtler, H [1 ]
机构
[1] Tech Univ Darmstadt, Inst Betriebswirtschaftslehre, Fachgebiet Fertigungs & Mat Wirtschaft, D-64289 Darmstadt, Germany
关键词
D O I
10.1287/opre.51.3.487.14949
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper a new time-oriented decomposition heuristic is proposed to solve the dynamic multi-item multilevel lot-sizing problem in general product structures with single and multiple constrained resources as well as setup times. While lot-sizing decisions are made sequentially within an internally rolling planning interval (or lot-sizing window), capacities are always considered over the entire planning horizon. For each submodel a model formulation based on the "Simple Plant Location" representation is developed. These mixed-integer linear submodels are solved by standard mathematical programming software even for relatively large test instances. Extensive computational tests show that the heuristic proposed provides a better solution quality than a well-known special purpose heuristic.
引用
收藏
页码:487 / 502
页数:16
相关论文
共 50 条