Precast production scheduling with genetic algorithms

被引:0
|
作者
Chan, WT [1 ]
Hu, H [1 ]
机构
[1] Natl Univ Singapore, Singapore 119260, Singapore
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
A flow shop sequencing model (FSSM) that incorporates actual constraints encountered in practice is proposed for the difficult case of specialized precast production scheduling. The model is solved using a Genetic Algorithm (GA). The traditional minimize makespan and the more practical minimize tardiness penalty objective functions are optimized separately, as well as simultaneously using a weighted approach. Experiments are conducted to investigate the effect of increasing population size and seeding the initial population with heuristic solutions. Comparisons between the GA and classical heuristic rules show that the GA is competitive, if not better than heuristic rules in discovering a set of good solutions.
引用
收藏
页码:1087 / 1094
页数:8
相关论文
共 50 条
  • [41] Scheduling of Genetic Algorithms in a Noisy Environment
    Aizawa, Akiko N.
    Wah, Benjamin W.
    EVOLUTIONARY COMPUTATION, 1994, 2 (02) : 97 - 122
  • [42] Information operator scheduling by genetic algorithms
    Yamada, T
    Yoshimura, K
    Nakano, R
    SIMULATED EVOLUTION AND LEARNING, 1999, 1585 : 50 - 57
  • [43] Genetic algorithms for flowshop scheduling problems
    Murata, T
    Ishibuchi, H
    Tanaka, H
    COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 30 (04) : 1061 - 1071
  • [44] Scheduling robotic actions by genetic algorithms
    Abbott, RJ
    Campbell, ML
    Krenz, WC
    PRESENCE-TELEOPERATORS AND VIRTUAL ENVIRONMENTS, 1996, 5 (02) : 191 - 204
  • [45] Genetic algorithms for satellite scheduling problems
    Xhafa, Fatos
    Sun, Junzi
    Barolli, Adrnir
    Biberaj, Alexander
    Barolli, Leonard
    MOBILE INFORMATION SYSTEMS, 2012, 8 (04) : 351 - 377
  • [46] Software Project Scheduling with Genetic Algorithms
    Lv Jianhong
    Yang Zhigang
    ISTM/2009: 8TH INTERNATIONAL SYMPOSIUM ON TEST AND MEASUREMENT, VOLS 1-6, 2009, : 3567 - 3570
  • [47] Genetic Algorithms for the Scheduling in Additive Manufacturing
    Castillo-Rivera, S.
    De Anton, J.
    Del Olmo, R.
    Pajares, J.
    Lopez-Paredes, A.
    INTERNATIONAL JOURNAL OF PRODUCTION MANAGEMENT AND ENGINEERING, 2020, 8 (02) : 59 - 63
  • [48] GENETIC ALGORITHMS AND JOB SHOP SCHEDULING
    BIEGEL, JE
    DAVERN, JJ
    COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 19 (1-4) : 81 - 91
  • [49] Flowshop scheduling using genetic algorithms
    Vosniakos, G. -C.
    Millas, V.
    Annals of DAAAM for 2006 & Proceedings of the 17th International DAAAM Symposium: INTELLIGENT MANUFACTURING & AUTOMATION: FOCUS ON MECHATRONICS AND ROBOTICS, 2006, : 437 - 438
  • [50] Construction resource scheduling with genetic algorithms
    Chan, WT
    Chua, DKH
    Kannan, G
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02): : 125 - 132