Techniques, issues and advances in numerical modelling of landslide hazard

被引:80
|
作者
van Asch, Theodore W. J.
Malet, Jean-Philippe
van Beek, Ludovicus P. H.
Amitrano, David
机构
[1] Univ Utrecht, UCEL, Fac Geosci, NL-3508 TC Utrecht, Netherlands
[2] UCBN, CNRS, UMR 6554, Lab Geog Phys & Environm LETG Geophen, F-14032 Caen, France
[3] Univ Grenoble 1, EA 3111, LIRIGM, F-38041 Grenoble, France
来源
关键词
landslide; hazard assessment; modelling; pre-failure; failure; post-failure; research directions;
D O I
10.2113/gssgfbull.178.2.65
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Slope movements (e.g. landslides) are dynamic systems that are complex in time and space and closely linked to both inherited and current preparatory and triggering controls. It is not yet possible to assess in all cases conditions for failure, reactivation and rapid surges and successfully simulate their transient and multi-dimensional behaviour and development, although considerable progress has been made in isolating many of the key variables and elementary mechanisms and to include them in physically-based models for landslide hazard assessments. Therefore, the objective of this paper is to review the state-of-the-art in the understanding of landslide processes and to identify some pressing challenges for the development of our modelling capabilities in the forthcoming years for hazard assessment. This paper focuses on the special nature of slope movements and the difficulties related to simulating their complex time-dependent behaviour in mathematical, physically-based models. It analyses successively the research frontiers in the recognition of first-time failures (pre-failure and failure stages), reactivation and the catastrophic transition to rapid gravitational processes (post-failure stage). Subsequently, the paper discusses avenues to transfer local knowledge on landslide activity to landslide hazard forecasts on regional scales and ends with an outline how geomorphological investigations and supporting monitoring techniques could be applied to improve the theoretical concepts and the modelling performance of physically-based landslide models at different spatial and temporal scales.
引用
收藏
页码:65 / 88
页数:24
相关论文
共 50 条
  • [31] Logistic Regression Fitting of Rainfall-Induced Landslide Occurrence Probability and Continuous Landslide Hazard Prediction Modelling
    Huang F.
    Chen J.
    Fan X.
    Huang J.
    Zhou C.
    Diqiu Kexue - Zhongguo Dizhi Daxue Xuebao/Earth Science - Journal of China University of Geosciences, 2022, 47 (12): : 4609 - 4628
  • [32] A new approach to temporal modelling for landslide hazard assessment using an extreme rainfall induced-landslide index
    Vasu, Nikhil Nedumpallile
    Lee, Seung-Rae
    Pradhan, Ananta Man Singh
    Kim, Yun-Tae
    Kang, Sin-Hang
    Lee, Deuk-Hwan
    ENGINEERING GEOLOGY, 2016, 215 : 36 - 49
  • [33] Probabilistic Hydrological Estimation of LandSlides (PHELS): global ensemble landslide hazard modelling
    Felsberg, Anne
    Heyvaert, Zdenko
    Poesen, Jean
    Stanley, Thomas
    De Lannoy, Gabrielle J. M.
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2023, 23 (12) : 3805 - 3821
  • [34] Landslide hazard prediction
    Wu, TH
    AbdelLatif, MA
    Wieczorek, GF
    LANDSLIDES-BK, 1996, : 423 - 428
  • [35] TSUNAMI HAZARD ON THE BLACK SEA COAST BY NUMERICAL MODELLING
    Dimova, Lyuba
    Raykova, Reneta
    COMPTES RENDUS DE L ACADEMIE BULGARE DES SCIENCES, 2018, 71 (10): : 1350 - 1356
  • [37] Numerical Modelling Techniques Structure of Galaxies
    Astrophysics and Space Science Library, 1994,
  • [38] Multiple-occurrence regional landslide events in New Zealand: Hazard management issues
    M. J. Crozier
    Landslides, 2005, 2 : 247 - 256
  • [39] Multiple-occurrence regional landslide events in New Zealand: Hazard management issues
    Crozier, MJ
    LANDSLIDES, 2005, 2 (04) : 247 - 256
  • [40] Joining of dissimilar metals: issues and modelling techniques
    Phanikumar, G.
    Chattopadhyay, K.
    Dutta, P.
    SCIENCE AND TECHNOLOGY OF WELDING AND JOINING, 2011, 16 (04) : 313 - 317