DE SCHEDULING PREVENTIVE MAINTENANCE WITHIN A QUEUE TIME FOR MAXIMUM THROUGHPUT IN SEMICONDUCTOR MANUFACTURING

被引:0
|
作者
Kalir, Adar A. [1 ]
Tirkel, Israel [2 ]
机构
[1] Intel Corp, Fab Sort Mfg Div, 2 HaZoran ST, Qiriat Gat, Israel
[2] Ben Gurion Univ Negev, Dept Ind Engn & Management, Beer Sheva, Israel
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We address the PM-QT problem, of scheduling preventive maintenance (PM) activities on tools within queue time (QT) restrictions, such that the overall throughput is maximized and the QT restrictions are not violated. Despite the increased occurrences of QT in semiconductor manufacturing, this problem has not been explicitly addressed. We formulate this problem as a mixed integer linear program (MILP) and propose a cross-entropy (CE) heuristic approach for its efficient solution. We show that the CE solutions are indeed efficient in runtime reductions with almost no compromise of the solution's quality (less than 1% difference between MILP and CE solutions for large scale problems).
引用
收藏
页码:2750 / 2761
页数:12
相关论文
共 50 条
  • [31] Scheduling sequence-dependent setup time job shops with preventive maintenance
    Naderi, B.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 170 - 181
  • [32] Digital twin-driven decision support system for opportunistic preventive maintenance scheduling in manufacturing
    Neto, Anis Assad
    Carrijo, Bruna Sprea
    Romanzini Brock, Joao Guilherme
    Deschamps, Fernando
    de Lima, Edson Pinheiro
    FAIM 2021, 2021, 55 : 439 - 446
  • [33] Dynamic Scheduling of Diffusion Furnace in Semiconductor Manufacturing with Real Time Events
    Rani, M. Vimala
    Mathirajan, M.
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 104 - 108
  • [34] Cycle time reduction through preventive maintenance de-clustering
    Zhang, Mike Tao
    Tag, Peter H.
    ISSM 2006 CONFERENCE PROCEEDINGS- 13TH INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, 2006, : 70 - 73
  • [35] A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing
    Sivakumar, AI
    Chong, CS
    COMPUTERS IN INDUSTRY, 2001, 45 (01) : 59 - 78
  • [36] Multiple product admission control in semiconductor manufacturing systems with process queue time (PQT) constraints
    Wu, Cheng-Hung
    Chien, Wen-Chi
    Chuang, Ya-Tang
    Cheng, Yu-Ching
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 99 : 347 - 363
  • [37] Minimizing maximum earliness in single-machine scheduling with flexible maintenance time
    Ganji, F.
    Moslehi, Gh.
    Jeddi, B. Ghalebsaz
    SCIENTIA IRANICA, 2017, 24 (04) : 2082 - 2094
  • [38] Opportunistic preventive maintenance scheduling for serial-parallel multistage manufacturing systems with multiple streams of deterioration
    Lu, Biao
    Zhou, Xiaojun
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 168 : 116 - 127
  • [39] USING SIMULATION TO IMPROVE SEMICONDUCTOR FACTORY CYCLE TIME BY SEGREGATION OF PREVENTIVE MAINTENANCE ACTIVITIES
    Rozen, Kosta
    Byrne, Neill M.
    2016 WINTER SIMULATION CONFERENCE (WSC), 2016, : 2676 - 2684
  • [40] A parallel-machine scheduling problem with time-changing effect and preventive maintenance
    Zhang X.-Y.
    Chen L.
    Yang W.-H.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2022, 56 (02): : 408 - 418