Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints

被引:16
|
作者
Gao, Yuan [1 ]
Yuan, Jinjiang [1 ]
机构
[1] Zhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Henan, Peoples R China
关键词
Bi-criteria; Pareto-scheduling; Positional due indices; Precedence constraints; TOTAL COMPLETION-TIME; MAXIMUM COST; MINIMIZE; JOBS;
D O I
10.1016/j.disopt.2017.02.004
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the Pareto-scheduling with bi-criteria on a single machine in which each task has a positional due index. Two bi-criteria problems are considered: (a) Pareto-scheduling with two agents A and B for minimizing the total completion time of A-tasks and a maximum cost of B-tasks with precedence constraints. (b) Pareto-scheduling under precedence constraints for minimizing two maximum costs of tasks. We show in this paper that the two problems are both solvable in polynomial time. The second result also implies that the Pareto-scheduling under precedence constraints for minimizing two agents' maximum costs is solvable in polynomial time. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:105 / 119
页数:15
相关论文
共 50 条
  • [21] Bi-criteria and tri-criteria analysis to minimize maximum lateness makespan and resource consumption for scheduling a single machine
    Yedidsion, Liron
    JOURNAL OF SCHEDULING, 2012, 15 (06) : 665 - 679
  • [22] Bi-criteria and tri-criteria analysis to minimize maximum lateness makespan and resource consumption for scheduling a single machine
    Liron Yedidsion
    Journal of Scheduling, 2012, 15 : 665 - 679
  • [23] Combination of Genetic Algorithm and LP-metric to Solve Single Machine Bi-criteria Scheduling Problem
    Aryanezhad, M. B.
    Jabbarzadeh, A.
    Zareei, A.
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1915 - 1919
  • [24] Stochastic machine scheduling with precedence constraints
    Skutella, M
    Uetz, M
    SIAM JOURNAL ON COMPUTING, 2005, 34 (04) : 788 - 802
  • [25] Machine scheduling with soft precedence constraints
    Zhang, An
    Qi, Xiangtong
    Li, Guanhua
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 282 (02) : 491 - 505
  • [26] Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs
    Cheng, Junheng
    Chu, Feng
    Liu, Ming
    Wu, Peng
    Xia, Weili
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 721 - 734
  • [27] AN INTERACTIVE PROCEDURE FOR BI-CRITERIA PRODUCTION SCHEDULING
    BERNARDO, JJ
    LIN, KS
    COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (06) : 677 - 688
  • [28] Bi-criteria Scheduling of Scientific Workflows for the Grid
    Wieczorek, Marek
    Podlipnig, Stefan
    Prodan, Radu
    Fahringer, Thomas
    CCGRID 2008: EIGHTH IEEE INTERNATIONAL SYMPOSIUM ON CLUSTER COMPUTING AND THE GRID, VOLS 1 AND 2, PROCEEDINGS, 2008, : 9 - 16
  • [29] Bi-Criteria Scheduling of Scientific Grid Workflows
    Prodan, Radu
    Wieczorek, Marek
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2010, 7 (02) : 364 - 376
  • [30] A bi-criteria two-machine flowshop scheduling problem with a learning effect
    Chen, P.
    Wu, C-C
    Lee, W-C
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (09) : 1113 - 1125