Stability Control of Underground Roadways Subjected to Stresses Caused by Extraction of a 10-m-Thick Coal Seam: A Case Study

被引:45
|
作者
Chen, Yong [1 ]
Ma, Shuqi [2 ]
Yu, Yang [3 ]
机构
[1] China Univ Min & Technol, State Key Lab Coal Resource & Safe Min, Xuzhou 221116, Jiangsu, Peoples R China
[2] Southwest Jiaotong Univ, Sch Civil Engn, Key Lab Transportat Tunnel Engn, Minist Educ, Chengdu 610031, Sichuan, Peoples R China
[3] Xuzhou Univ Technol, Sch Civil Engn, Xuzhou 221111, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Thick coal seam; Longwall top coal caving method; Stability control; Coal pillar width; Impact range; Underground roadway; PILLAR EXTRACTION; STRATA MOVEMENT; MECHANISM;
D O I
10.1007/s00603-017-1217-z
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Extraction of a 10-m-thick coal seam in one single lift using the longwall top coal caving method caused severe deformations in underground roadways in Majialiang coal mine in Shanxi Province, China. Field monitoring of stress changes in the roof and in the coal pillar, and deformation of the 14202 tailgate, were carried out. The deformation monitoring found that the maximum floor heave of the 14202 tailgate was 1.85 m when the monitoring point was 250 m behind the longwall working face, while the maximum roof subsidence and the maximum rib-rib convergence was 0.93 and 1.14 m, respectively. The deformation rate of the 14202 tailgate increased dramatically when the monitoring point was at distances of 100-150 m behind the longwall working face, which reflected the fact that the tailgate underwent sharply increased loads within this range. Field monitoring of stress changes and the displacement of the 14202 tailgate revealed that the impact range of the mining-induced stresses in longitudinal direction (the same as the mining direction) was from 60 m ahead of the longwall face to 250 m behind the longwall face. Additionally, the mining impact range in transverse direction was more than 45 m, indicating that the coal pillar width should be larger than 45 m to avoid significant influences of mining-induced stresses. This finding was applied to the 14103 tailgate, which was subjected to similar mining and geological conditions as the 14202 tailgate. A coal pillar with width of 56 m was adopted in the 14103 tailgate, and displacement monitoring showed that large deformation was successfully controlled. The field investigations in this study provide a basis for design of a proper coal pillar width of underground roadways when subjected to large stresses induced by mining of thick coal seams in a single lift.
引用
收藏
页码:2511 / 2520
页数:10
相关论文
共 33 条
  • [31] Geological and engineering collaborative control technology for high production of CBM wells in thin-medium-thick coal seam clusters: A case study of Wenjiaba block in the Zhina Coalfield, Guizhou
    Chen C.
    Zhou X.
    Zhao F.
    Meng H.
    Zhu S.
    Zhao Y.
    Wei Y.
    Natural Gas Industry, 2023, 43 (01) : 55 - 64
  • [32] Failure Mechanism and Stability Control Technology of Slope during Open-Pit Combing Underground Extraction: A Case Study from Shanxi Province of China
    Shi, Shuaihang
    Guo, Zizheng
    Ding, Peng
    Tao, Yabin
    Mao, Hui
    Jiao, Zhichao
    SUSTAINABILITY, 2022, 14 (14)
  • [33] Stress evolution characteristics of the intensively mining-induced surrounding roadways within an extra-thick coal seam: A case study from the Tashan coal mine, China特厚煤层综放强采动巷道围岩应力演化特征: 以塔山矿为例
    Hong Yan
    Gui-chen Li
    Yong-qi Li
    Qing-chao Zhang
    Chuan-qi Zhu
    Journal of Central South University, 2023, 30 : 3840 - 3854