Distributed Parallel Stochastic Dynamic Programming Algorithm Based on MPI and Multithread for Long-Term Optimal Operation of Cascaded Hydropower Stations

被引:0
|
作者
Zhou, Dong-qing [1 ]
Peng, Shi-yu [1 ]
Sun, Kang-li [1 ]
Li, Xiu-feng [2 ]
Cheng, Chun-tian [3 ]
机构
[1] Dalian Univ Technol, Sch Comp Sci & Technol, Dalian, Liaoning, Peoples R China
[2] Yunnan Power Dispatching Ctr, Kunming, Yunnan, Peoples R China
[3] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian, Liaoning, Peoples R China
关键词
Stochastic dynamic programming; Distributed parallel computation; MPI; Multithread;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Stochastic dynamic programming (SDP) is widely adopted in a long-term optimal operation of large-scale hydropower systems. In this paper we propose a distributed parallel stochastic dynamic programming algorithm based on Message Passing Interface (MPI) and a peer-to-peer parallel paradigm (DPSDPoM). To deal with the disadvantages of redundancy in communications and memory-consumption during calculation in the peer-to-peer parallel paradigm, we propose a DPSDPoM with multithread algorithm (DPSDPoM-MT) which reduces costs between processes in each machine. The two algorithms are compared through the optimization scheduling of three reservoirs on Lancang Jiang Dam Cascade using time-elapse and memory consumption. Experimental results demonstrate that the improved algorithm can reduce computing time and alleviate memory consumption effectively.
引用
收藏
页码:798 / 808
页数:11
相关论文
共 50 条
  • [1] Long-term optimal operation of cascade hydropower stations based on the utility function of the carryover potential energy
    Tan, Qiao-Feng
    Wen, Xin
    Fang, Guo-Hua
    Wang, Yong-Qiang
    Qin, Guang-Hua
    Li, Hao-Min
    [J]. JOURNAL OF HYDROLOGY, 2020, 580
  • [2] Long-term risk dispatching of cascaded hydropower stations in electricity market
    Ma, Chao
    Lian, Jijian
    [J]. 2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 73 - 77
  • [3] Medium and Long Term Optimal Scheduling of Cascade Hydropower Stations Based on Topological Parallel Computing
    Ji, Changming
    Wu, Hao
    [J]. JOURNAL OF COASTAL RESEARCH, 2019, : 572 - 577
  • [4] An Efficient Linearization Method for Long-Term Operation of Cascaded Hydropower Reservoirs
    Chuanxiong Kang
    Cheng Chen
    Jinwen Wang
    [J]. Water Resources Management, 2018, 32 : 3391 - 3404
  • [5] An Efficient Linearization Method for Long-Term Operation of Cascaded Hydropower Reservoirs
    Kang, Chuanxiong
    Chen, Cheng
    Wang, Jinwen
    [J]. WATER RESOURCES MANAGEMENT, 2018, 32 (10) : 3391 - 3404
  • [6] A Multi-Core Parallel Genetic Algorithm for the Long-Term Optimal Operation of Large-Scale Hydropower Systems
    Liu, Benxi
    Liao, Shengli
    Cheng, Chuntian
    Wu, Xinyu
    [J]. WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2016: WATERSHED MANAGEMENT, IRRIGATION AND DRAINAGE, AND WATER RESOURCES PLANNING AND MANAGEMENT, 2016, : 220 - 230
  • [7] Particle Swarm Optimization for Long-term Operation of Cascade Hydropower Stations
    Chen Lihua
    Zhao Yakun
    Mei Yadong
    Yang Na
    [J]. 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [8] Aggregated Inflows on Stochastic Dynamic Programming for Long Term Hydropower Scheduling
    Scarcelli, Ricardo O.
    Zambelli, Monica S.
    Filho, Secundino. S.
    Carneiro, Adriano A.
    [J]. 2014 NORTH AMERICAN POWER SYMPOSIUM (NAPS), 2014,
  • [9] Peak hydropower plant operation based on stochastic dynamic programming analysis
    Tică, Eliza–Isabela
    Popa, Radu
    [J]. UPB Scientific Bulletin, Series D: Mechanical Engineering, 2016, 78 (04): : 191 - 206
  • [10] Study on the Optimal Operation of a Hydropower Plant Group Based on the Stochastic Dynamic Programming with Consideration for Runoff Uncertainty
    Zhang, Hongxue
    Zhang, Lianpeng
    Chang, Jianxia
    Li, Yunyun
    Long, Ruihao
    Xing, Zhenxiang
    [J]. WATER, 2022, 14 (02)