Study on the Optimal Operation of a Hydropower Plant Group Based on the Stochastic Dynamic Programming with Consideration for Runoff Uncertainty

被引:0
|
作者
Zhang, Hongxue [1 ]
Zhang, Lianpeng [2 ]
Chang, Jianxia [2 ]
Li, Yunyun [3 ]
Long, Ruihao [4 ]
Xing, Zhenxiang [1 ]
机构
[1] Northeast Agr Univ, Sch Water Conservancy & Civil Engn, Harbin 150030, Peoples R China
[2] Xian Univ Technol, State Key Lab Ecohydraul NW Arid Reg, Xian 710048, Peoples R China
[3] Mianyang Normal Univ, Coll Resources & Environm Engn, Mianyang 621000, Sichuan, Peoples R China
[4] Shaanxi Prov Inst Water Resources & Elect Power I, Xian 710005, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
reservoir operation; copula function; Gibbs; SDP; Lancang River; RESERVOIR OPERATIONS; WATER; RIVER; MANAGEMENT; ALLOCATION; RAINFALL; ENTROPY; RULES; BASIN;
D O I
10.3390/w14020220
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Hydropower plant operation reorganizes the temporal and spatial distribution of water resources to promote the comprehensive utilization of water resources in the basin. However, a lot of uncertainties were brought to light concerning cascade hydropower plant operation with the introduction of the stochastic process of incoming runoff. Therefore, it is of guiding significance for the practice operation to investigate the stochastic operation of cascade hydropower plants while considering runoff uncertainty. The runoff simulation model was constructed by taking the cascade hydropower plants in the lower reaches of the Lancang River as the research object, and combining their data with the copula joint function and Gibbs method, and a Markov chain was adopted to construct the transfer matrix of runoff between adjacent months. With consideration for the uncertainty of inflow runoff, the stochastic optimal operation model of cascade hydropower plants was constructed and solved by the SDP algorithm. The results showed that 71.12% of the simulated monthly inflow of 5000 groups in the Nuozhadu hydropower plant drop into the reasonable range. Due to the insufficiency of measured runoff, there were too many 0 values in the derived transfer probability, but after the simulated runoff series were introduced, the results significantly improved. Taking the transfer probability matrix of simulated runoff as the input of the stochastic optimal operation model of the cascade hydropower plants, the operation diagram containing the future-period incoming water information was obtained, which could directly provide a reference for the optimal operation of the Nuozhadu hydropower plant. In addition, taking the incoming runoff process in a normal year as the standard, the annual mean power generation based on stochastic dynamic programming was similar to that based on dynamic programming (respectively 305.97 x 10(8) kW.h and 306.91 x 10(8) kW.h), which proved that the operation diagram constructed in this study was reasonable.
引用
收藏
页数:27
相关论文
共 50 条
  • [1] Peak hydropower plant operation based on stochastic dynamic programming analysis
    Tică, Eliza–Isabela
    Popa, Radu
    [J]. UPB Scientific Bulletin, Series D: Mechanical Engineering, 2016, 78 (04): : 191 - 206
  • [2] Optimal operation of a hydropower plant in a stochastic environment
    Figuerola-Ferretti, Isabel
    Schwartz, Eduardo
    Segarra, Ignacio
    [J]. QUANTITATIVE FINANCE, 2024, 24 (05) : 521 - 539
  • [3] Comparison study between dynamic programming and particle swarm algorithm for the optimal operation of hydropower plant
    Cheng, Chuntian
    Tang, Zitian
    Li, Gang
    Yang, Binbin
    [J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2008, 27 (06): : 27 - 31
  • [4] Bayesian Stochastic Dynamic Programming for Hydropower Generation Operation Based on Copula Functions
    Qiao-feng Tan
    Guo-hua Fang
    Xin Wen
    Xiao-hui Lei
    Xu Wang
    Chao Wang
    Yi Ji
    [J]. Water Resources Management, 2020, 34 : 1589 - 1607
  • [5] Bayesian Stochastic Dynamic Programming for Hydropower Generation Operation Based on Copula Functions
    Tan, Qiao-feng
    Fang, Guo-hua
    Wen, Xin
    Lei, Xiao-hui
    Wang, Xu
    Wang, Chao
    Ji, Yi
    [J]. WATER RESOURCES MANAGEMENT, 2020, 34 (05) : 1589 - 1607
  • [6] Stochastic MPC For Optimal Operation of Hydropower Station Under Uncertainty
    Jeong, Changhun
    Sharma, Roshan
    [J]. IFAC PAPERSONLINE, 2022, 55 (07): : 155 - 160
  • [7] Uniform dynamic programming and its application in optimal operation of hydropower system
    Feng, Zhongkai
    Cheng, Chuntian
    Niu, Wenjing
    Liao, Shengli
    Shen, Jianjian
    [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2015, 46 (12): : 1487 - 1496
  • [8] Analysis of a Stochastic Programming Model for Optimal Hydropower System Operation under a Deregulated Electricity Market by Considering Forecasting Uncertainty
    Xu, Bin
    Zhong, Ping-An
    Du, Baoyi
    Chen, Juan
    Liu, Weifeng
    Li, Jieyu
    Guo, Le
    Zhao, Yunfa
    [J]. WATER, 2018, 10 (07)
  • [9] Distributed Parallel Stochastic Dynamic Programming Algorithm Based on MPI and Multithread for Long-Term Optimal Operation of Cascaded Hydropower Stations
    Zhou, Dong-qing
    Peng, Shi-yu
    Sun, Kang-li
    Li, Xiu-feng
    Cheng, Chun-tian
    [J]. COMPUTER SCIENCE AND TECHNOLOGY (CST2016), 2017, : 798 - 808
  • [10] Incorporating Penalty Function to Reduce Spill in Stochastic Dynamic Programming Based Reservoir Operation of Hydropower Plants
    Jha, Deependra Kumar
    Yorino, Naoto
    Zoka, Yoshifumi
    Sasaki, Yutaka
    Hayashi, Yuki
    Iwata, Kajunoni
    Oe, Ryuji
    [J]. IEEJ TRANSACTIONS ON ELECTRICAL AND ELECTRONIC ENGINEERING, 2010, 5 (05) : 531 - 538