共 50 条
- [23] Experimental Study on the Stress Increment of Prestressed Tendons of Retard-Bonded Prestressed Concrete Continuous Beams ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 1431 - +
- [24] TIME-DEPENDENT BEHAVIORS OF PRESTRESSED CONCRETE TRACK BEAMS UNDER SUSTAINED LOADS PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 1012 - 1017
- [27] TIME-DEPENDENT ANALYSIS OF PRESTRESSED COMPOSITE BEAMS JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1995, 121 (04): : 621 - 633
- [28] ELASTIC STRESSES IN CRACKED PRESTRESSED PRETENSIONED CONCRETE COMPOSITE BEAMS WITH BONDED TENDONS. Acta Technica (Budapest), 1982, 95 (1-4): : 63 - 82
- [29] PRESTRESSED CONCRETE BEAMS WITH UNBONDED TENDONS. Indian Concrete Journal, 1986, 60 (02): : 40 - 44
- [30] Ductility of concrete beams prestressed with CFRP tendons Fang, Z. (fangzhi@hnu.cn), 2005, Tsinghua University (22):