An integrated approach of train scheduling and rolling stock circulation with skip-stopping pattern for urban rail transit lines

被引:29
|
作者
Zhao, Shuo [1 ]
Yang, Hai [2 ]
Wu, Yinghui [3 ]
机构
[1] China Acad Railway Sci Corp Ltd, Inst Comp Technol, Beijing 100081, Peoples R China
[2] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Kowloon, Clear Water Bay, Hong Kong, Peoples R China
[3] Jiangsu Univ Sci & Technol, Sch Econ & Management, Zhenjiang 212100, Jiangsu, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金; 国家重点研发计划;
关键词
Integrated planning; Fairness; Workload balance; Urban rail transit; Mixed-integer nonlinear programming; Iterative searching approach; TIME-DEPENDENT DEMAND; PASSENGER DEMAND; WAITING TIME; OPTIMIZATION; ALGORITHM; NETWORK; MODEL; MINIMIZATION; GENERATION; EFFICIENCY;
D O I
10.1016/j.trc.2021.103170
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Integrated planning for urban rail transit (URT) systems is a significant technique in URT operation to balance service level and operating cost. It is generally oriented towards transportation efficiency and solved in a sequential way due to the complexity, but ignores the service experiences among equitable passengers and the utilization balance among equal rolling stocks. This paper aims to study the integrated planning for an oversaturated URT line, incorporating the fairness in train scheduling and workload balance in rolling stock circulation that are measured by two defined min-max indexes. A mixed-integer nonlinear programming (MINLP) model is established to formulate the integrated planning of stop planning, train scheduling and rolling stock circulation, explicitly considering time-dependent origin-destination demand, first-come-first-serve principle and rigid capacity constraints. Due to the model complexity, an iterative searching approach (ISA) is proposed to solve the model, involving adjusting stop patterns, departure times and connections at the depot terminal. The performance of the ISA is evaluated by three cases with different time lengths based on the practical data from No.8 URT line in Guangzhou. The results are compared with the practical plans and the solutions solved by the two-stage approach respectively. It shows that the ISA can not only mitigate unfairness and balance workload, but also improve transportation efficiency. We also investigate the optimization effects and application conditions of different combinations of searching strategies in the ISA. Furthermore, the study on the typical case during peak hours shows more details about the optimization effects and mechanism of the ISA, which can reach a uniform state in both service level and resource utilization.
引用
下载
收藏
页数:33
相关论文
共 41 条
  • [21] Optimization of rolling stock scheduling scheme for urban rail transit under reconnection marshalling
    Zhu, Changfeng
    Jia, Jinxiu
    Ma, Bin
    Sun, Yuanguang
    Wang, Jie
    Cheng, Linna
    Journal of Railway Science and Engineering, 2024, 21 (07) : 2626 - 2636
  • [22] Train Operational Plan Optimization for Urban Rail Transit Lines Considering Circulation Balance
    Zhao, Shuo
    Wu, Jinfei
    Li, Zhenyi
    Meng, Ge
    SUSTAINABILITY, 2022, 14 (09)
  • [23] Integrated Optimization of Train Diagrams and Rolling Stock Circulation with Full-Length and Short-Turn Routes of Virtual Coupling Trains in Urban Rail Transit
    Lu, Fang
    Wang, Liyu
    Hu, Jiangfeng
    Zhang, Qi
    Li, Xiaojuan
    APPLIED SCIENCES-BASEL, 2024, 14 (12):
  • [24] An Approach to Calculate Overall Efficiency of Rolling Stock for an Urban Rail Transit System
    Mahboob, Qamar
    Stoiber, Thomas
    Gottstein, Stephanie
    Tsakarestos, Antonios
    JOURNAL OF PUBLIC TRANSPORTATION, 2012, 15 (01) : 19 - 32
  • [25] Train timetabling with passenger data and heterogeneous rolling stocks circulation on urban rail transit line
    Yang Yuhua
    Samà Marcella
    Pacciarelli Dario
    Ni Shaoquan
    Soft Computing, 2023, 27 : 12959 - 12977
  • [26] Train timetabling with passenger data and heterogeneous rolling stocks circulation on urban rail transit line
    Yang Yuhua
    Marcella, Sama
    Dario, Pacciarelli
    Ni Shaoquan
    SOFT COMPUTING, 2023, 27 (18) : 12959 - 12977
  • [27] Integrated Optimization of Rolling Stock Deadhead Routing and Timetabling in Urban Rail Transit Line
    Wang D.
    Zhao J.
    Zhong Q.
    Peng Q.
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (08): : 19 - 31
  • [29] Optimal train scheduling under a flexible skip-stop scheme for urban rail transit based on smartcard data
    Zhang, Peitong
    Liu, Xiaobo
    Chen, Mei
    2016 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT RAIL TRANSPORTATION (ICIRT), 2016, : 19 - 28
  • [30] Collaborative Optimization of Urban Rail Transit Timetable and Rolling Stock Circulation Under Tidal Passenger Flow
    Li S.-J.
    Shang Y.-X.
    Liu Z.-G.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2023, 23 (04): : 175 - 183