An integrated approach of train scheduling and rolling stock circulation with skip-stopping pattern for urban rail transit lines

被引:29
|
作者
Zhao, Shuo [1 ]
Yang, Hai [2 ]
Wu, Yinghui [3 ]
机构
[1] China Acad Railway Sci Corp Ltd, Inst Comp Technol, Beijing 100081, Peoples R China
[2] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Kowloon, Clear Water Bay, Hong Kong, Peoples R China
[3] Jiangsu Univ Sci & Technol, Sch Econ & Management, Zhenjiang 212100, Jiangsu, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金; 国家重点研发计划;
关键词
Integrated planning; Fairness; Workload balance; Urban rail transit; Mixed-integer nonlinear programming; Iterative searching approach; TIME-DEPENDENT DEMAND; PASSENGER DEMAND; WAITING TIME; OPTIMIZATION; ALGORITHM; NETWORK; MODEL; MINIMIZATION; GENERATION; EFFICIENCY;
D O I
10.1016/j.trc.2021.103170
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Integrated planning for urban rail transit (URT) systems is a significant technique in URT operation to balance service level and operating cost. It is generally oriented towards transportation efficiency and solved in a sequential way due to the complexity, but ignores the service experiences among equitable passengers and the utilization balance among equal rolling stocks. This paper aims to study the integrated planning for an oversaturated URT line, incorporating the fairness in train scheduling and workload balance in rolling stock circulation that are measured by two defined min-max indexes. A mixed-integer nonlinear programming (MINLP) model is established to formulate the integrated planning of stop planning, train scheduling and rolling stock circulation, explicitly considering time-dependent origin-destination demand, first-come-first-serve principle and rigid capacity constraints. Due to the model complexity, an iterative searching approach (ISA) is proposed to solve the model, involving adjusting stop patterns, departure times and connections at the depot terminal. The performance of the ISA is evaluated by three cases with different time lengths based on the practical data from No.8 URT line in Guangzhou. The results are compared with the practical plans and the solutions solved by the two-stage approach respectively. It shows that the ISA can not only mitigate unfairness and balance workload, but also improve transportation efficiency. We also investigate the optimization effects and application conditions of different combinations of searching strategies in the ISA. Furthermore, the study on the typical case during peak hours shows more details about the optimization effects and mechanism of the ISA, which can reach a uniform state in both service level and resource utilization.
引用
下载
收藏
页数:33
相关论文
共 41 条
  • [1] Integrated Rolling Stock Scheduling and Maintenance Scheduling Optimization of Urban Rail Transit Lines Based on Shared Train Depot
    Feng J.
    Li G.-W.
    Fu Y.-L.
    Peng C.
    Wu Y.-H.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2023, 23 (01): : 131 - 140
  • [2] Train scheduling and circulation planning in urban rail transit lines
    Wang, Yihui
    Liao, Zhibin
    Tang, Tao
    Ning, Bin
    CONTROL ENGINEERING PRACTICE, 2017, 61 : 112 - 123
  • [3] Q-learning approach to coordinated optimization of passenger inflow control with train skip-stopping on a urban rail transit line
    Jiang, Zhibin
    Gu, Jinjing
    Fan, Wei
    Liu, Wei
    Zhu, Bingqin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 127 : 1131 - 1142
  • [4] Passenger demand oriented train scheduling and rolling stock circulation planning for an urban rail transit line
    Wang, Yihui
    D'Ariano, Andrea
    Yin, Jiateng
    Meng, Lingyun
    Tang, Tao
    Ning, Bin
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 118 : 193 - 227
  • [5] Demand-driven integrated train timetabling and rolling stock scheduling on urban rail transit line
    Zhuo, Siyu
    Miao, Jianrui
    Meng, Lingyun
    Yang, Liya
    Shang, Pan
    TRANSPORTMETRICA A-TRANSPORT SCIENCE, 2024, 20 (03)
  • [6] Equity-oriented skip-stopping schedule optimization in an oversaturated urban rail transit network
    Shang, Pan
    Li, Ruimin
    Liu, Zhiyong
    Yang, Liya
    Wang, Yuqiang
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2018, 89 : 321 - 343
  • [7] Integrated rolling stock deadhead routing and timetabling in urban rail transit lines
    Wang, Dian
    D'Ariano, Andrea
    Zhao, Jun
    Zhong, Qingwei
    Peng, Qiyuan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 298 (02) : 526 - 559
  • [8] Integrated optimization of regular train schedule and train circulation plan for urban rail transit lines
    Wang, Yihui
    Tang, Tao
    Ning, Bin
    Meng, Lingyun
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 105 : 83 - 104
  • [9] Integrated Train Timetabling and Rolling Stock Scheduling Model Based on Time-Dependent Demand for Urban Rail Transit
    Yue, Yixiang
    Han, Juntao
    Wang, Shifeng
    Liu, Xiang
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2017, 32 (10) : 856 - 873
  • [10] Integrated optimization of rolling stock allocation and train timetables for urban rail transit networks: A benders decomposition approach
    Yin, Jiateng
    Pu, Fan
    Yang, Lixing
    D'Ariano, Andrea
    Wang, Zhouhong
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2023, 176