Determining dynamic water level control boundaries for a multi-reservoir system during flood seasons with considering channel storage

被引:19
|
作者
Gong, Yu [1 ,2 ]
Liu, Pan [1 ,2 ]
Cheng, Lei [1 ,2 ]
Chen, Guiya [3 ]
Zhou, Yanlai [4 ]
Zhang, Xiaoqi [1 ,2 ]
Xu, Weifeng [1 ,2 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Hubei, Peoples R China
[2] Hubei Prov Collaborat Innovat Ctr Water Resources, Wuhan, Hubei, Peoples R China
[3] Changjiang Water Resources Commiss, Off Flood Control & Drought Relief, Wuhan, Hubei, Peoples R China
[4] Univ Oslo, Dept Geosci, Oslo, Norway
来源
JOURNAL OF FLOOD RISK MANAGEMENT | 2020年 / 13卷 / 01期
基金
中国国家自然科学基金;
关键词
aggregation-decomposition; channel storage reservoir; dynamic control boundary; multi-reservoir operation; water level during flood seasons; POWER-GENERATION; OPERATING RULES; OPTIMAL-DESIGN; RISK ANALYSIS; UNCERTAINTY; MODEL;
D O I
10.1111/jfr3.12586
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The dynamic control of reservoir water level during flood seasons (WLFS) allows a trade-off between flood control and water resources conservation. In this process, the WLFS dynamic control boundaries are key parameters. The channel flood routing affects the dynamic control operations. However, flood routing is seldom considered in multi-reservoir aggregation (a popular method for tackling the curse of dimensionality in multi-reservoir issues). To address this knowledge gap, this study conceptualises channel flood routing as a virtual channel storage reservoir (CSR) based on Muskingum flood routing in the aggregation method. The dynamic control boundaries for the multi-reservoir WLFS are then derived using the following aggregation-decomposition method: (a) the aggregation reservoir is created by considering channel storages, and the flood risk is quantified using pre-discharge rules; and (b) the aggregated reservoir storages are decomposed by maximising hydropower generation with constraints. The Xiluodu, Xiangjiaba and Three Gorges reservoir system on the Yangtze River, China, were selected for a case study. The annual power generation is 175.40 billion kWh when using static operation rules. With dynamic operation, the output would be 177.05 billion kWh if CSRs were not considered and 177.53 billion kWh if CSRs were considered. Thus, the proposed method can efficiently determine the dynamic control boundaries for the multi-reservoir WLFS.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] RETRACTED: Dynamic Control of Water Level in Flood Limited Reservoir Based on Intelligent Calculation (Retracted Article)
    Pan, Jianbo
    Xie, Yan
    Liu, Meng
    Gao, Zhuo
    Gao, Zhenzan
    Xue, Bowen
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [42] Dynamic Management of Water Storage for Flood Control in a Wetland System: A Case Study in Texas
    Leon, Arturo S.
    Tang, Yun
    Chen, Duan
    Yolcu, Ahmet
    Glennie, Craig
    Pennings, Steven C.
    WATER, 2018, 10 (03)
  • [43] Research on the dynamic control of the flood control level of Shimen Reservoir in the mode of pre-storage and pre-discharge regulation
    Huang Lingzhi
    Li Shouyi
    Si Zheng
    3RD INTERNATIONAL CONFERENCE ON ENERGY EQUIPMENT SCIENCE AND ENGINEERING (ICEESE 2017), 2018, 128
  • [44] Minimizing the impact of vacating instream storage of a multi-reservoir system: a trade-off study of water supply and empty flushing
    Wu, Chia-Wen
    Chou, Frederick N-F
    Lee, Fong-Zuo
    HYDROLOGY AND EARTH SYSTEM SCIENCES, 2021, 25 (04) : 2063 - 2087
  • [45] Dynamic control bound of flood limited water level considering capacity compensation regulation and design flood uncertainty of cascade reservoirs
    Tan Q.
    Lei X.
    Wang H.
    Wang X.
    Wang, Xu (1554583613@qq.com), 2017, Sichuan University (49): : 60 - 69
  • [46] Optimal control of drought limit water level for multi-year regulating storage reservoir
    Peng S.
    Wang Y.
    Zhang Y.
    Jiang G.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2016, 47 (04): : 552 - 559
  • [47] Real-time dynamic control of the limited water level of reservoir in flood period and its risk analysis
    Zhang, Gaihong
    Zhou, Huicheng
    Wang, Bende
    Zheng, Defeng
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (01): : 51 - 55
  • [48] Determining the optimal year-end water level of a multi-year regulating storage reservoir: a case study
    Wang, Jinlong
    Huang, Weibin
    Ma, Guangwen
    Wang, Yuhua
    WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, 2016, 16 (02): : 284 - 294
  • [49] Multi-Objective Optimal Scheduling Model of Dynamic Control of Flood Limit Water Level for Cascade Reservoirs
    Liu, Guanjun
    Qin, Hui
    Shen, Qin
    Tian, Rui
    Liu, Yongqi
    WATER, 2019, 11 (09)
  • [50] Using 2D HEC-RAS Modeling and Embankment Dam Break Scenario for Assessing the Flood Control Capacity of a Multi-Reservoir System (NE Romania)
    Urzica, Andrei
    Mihu-Pintilie, Alin
    Stoleriu, Cristian Constantin
    Cimpianu, Catalin Ioan
    Hutanu, Elena
    Pricop, Claudiu Ionut
    Grozavu, Adrian
    WATER, 2021, 13 (01)