共 50 条
- [31] Minimizing total completion time in the two-machine no-idle no-wait flow shop problem Journal of Heuristics, 2021, 27 : 159 - 173
- [34] MINIMIZING THE MAKESPAN IN TWO-MACHINE JOB SHOP SCHEDULING PROBLEMS WITH NO MACHINE IDLE-TIME ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 89 - +
- [39] A better approximation for the two-machine flowshop scheduling problem with time lags ALGORITHMS AND COMPUTATION, PROCEEDINGS, 2003, 2906 : 309 - 318