Assembly line balancing in a mixed-model sequencing environment with synchronous transfers

被引:72
|
作者
Karabati, S [1 ]
Sayin, S [1 ]
机构
[1] Koc Univ, Coll Adm Sci & Econ, TR-80910 Istanbul, Turkey
关键词
mixed-model assembly lines; cyclic scheduling; assembly line balancing;
D O I
10.1016/S0377-2217(02)00764-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the assembly line balancing problem in a mixed-model line which is operated under a cyclic sequencing approach. We specifically study the problem in an assembly line environment with synchronous transfer of parts between the stations. We formulate the assembly line balancing problem with the objective of minimizing total cycle time by incorporating the cyclic sequencing information. We show that the solution of a mathematical model that combines multiple models into a single one by adding up operation times constitutes a lower bound for this formulation. As an approximate solution to the original problem, we propose an alternative formulation that suggests to minimize the maximum subcycle time. We also develop a simple heuristic approach for this alternative problem. We provide computational results that compare the various approaches we discuss. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:417 / 429
页数:13
相关论文
共 50 条
  • [31] Recursive Heuristic Algorithm for Balancing Mixed-Model Assembly Line Type-II in Stochastic Environment
    Aufy, Samah A.
    Kassam, AllaEldin H.
    [J]. LOGISTICS AND SUPPLY CHAIN MANAGEMENT, LSCM 2020, 2021, 1458 : 194 - 218
  • [32] Optimization of workcell layouts in a mixed-model assembly line environment
    Erica Klampfl
    Oleg Gusikhin
    Giuseppe Rossi
    [J]. International Journal of Flexible Manufacturing Systems, 2005, 17 : 277 - 299
  • [33] Optimization of workcell layouts in a mixed-model assembly line environment
    Erica Klampfl
    Oleg Gusikhin
    Giuseppe Rossi
    [J]. International Journal of Flexible Manufacturing Systems, 2007, 19 : 65 - 65
  • [34] Minimising utility work and utility worker transfers for a mixed-model assembly line
    Cevikcan, Emre
    Durmusoglu, M. Bulent
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (24) : 7293 - 7314
  • [35] An investigation of mixed-model assembly line balancing problem with uncertain assembly time in remanufacturing
    Liu, Qingtao
    Wei, Xinji
    Wang, Qi
    Song, Jiayao
    Lv, Jingxiang
    Liu, Ying
    Tang, Ou
    [J]. Computers and Industrial Engineering, 2024, 198
  • [36] A Balancing Method of Mixed-model Disassembly Line in Random Working Environment
    Xia, Xuhui
    Liu, Wei
    Zhang, Zelin
    Wang, Lei
    Cao, Jianhua
    Liu, Xiang
    [J]. SUSTAINABILITY, 2019, 11 (08):
  • [37] Multi-criteria sequencing problem in mixed-model synchronous assembly lines
    Mohsen Salehi
    Parviz Fattahi
    Abdolreza Roshani
    Javad Zahiri
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 67 : 983 - 993
  • [38] Multi-criteria sequencing problem in mixed-model synchronous assembly lines
    Salehi, Mohsen
    Fattahi, Parviz
    Roshani, Abdolreza
    Zahiri, Javad
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (1-4): : 983 - 993
  • [39] Real options approach for a mixed-model assembly line sequencing problem
    Rabbani, Masoud
    Rahimi-Vahed, Alireza
    Torabi, Seyed Ali
    [J]. International Journal of Advanced Manufacturing Technology, 2008, 37 (11-12): : 1209 - 1219
  • [40] Bi-objective sequencing decision model for mixed-model assembly line
    Sun, Baofeng
    Shen, Xiuxiu
    Long, Shuling
    Lu, Zhaoyu
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2017, 23 (07): : 1481 - 1491