共 50 条
- [41] FACTORS INFLUENCING THE DESIGN AND CONSTRUCTION OF LNG STORAGE TANKS PROCEEDINGS OF THE ASME 31ST INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2012, VOL 6, 2012, : 325 - 327
- [42] DEVELOPMENT OF 6% NICKEL STEEL FOR LNG STORAGE TANKS OMAE2011: PROCEEDINGS OF THE ASME 30TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, VOL 3: MATERIALS TECHNOLOGY, 2011, : 327 - +
- [44] ACSAICHE 99082-Marine boil-off gas recovery improvement by performing slow loading at Bontang LNG terminal ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2008, 235
- [45] Effect of Ambient Conditions on Boil Off Gas Generation in LNG regasification terminals 29TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT A, 2019, 46 : 445 - 450
- [47] Optimization of boil-off gas recondensation process in LNG receiving terminal Huagong Xuebao, 2009, 11 (2876-2881):
- [49] Seismic performance evaluation of boil-off gas compressor in LNG terminal Open Civil Engineering Journal, 2015, 9 (01): : 557 - 569
- [50] Research on the Brayton cycle design conditions for reliquefaction cooling of LNG boil off Journal of Marine Science and Technology, 2012, 17 : 532 - 541