The assembly line worker assignment and balancing problem with stochastic worker availability

被引:45
|
作者
Ritt, Marcus [1 ]
Costa, Alysson M. [2 ]
Miralles, Cristobal [3 ]
机构
[1] Univ Fed Rio Grande do Sul, Inst Informat, Porto Alegre, RS, Brazil
[2] Univ Melbourne, Sch Math & Stat, Melbourne, Vic, Australia
[3] Univ Politecn Valencia, ROGLE, Dept Org Empresas, E-46022 Valencia, Spain
关键词
heterogeneous workforce; stochastic programming; assembly line balancing; simulated annealing; mixed integer linear programming; SINGLE-MODEL; COST; ALGORITHM; METHODOLOGY; EXTENSIONS; HEURISTICS; CENTERS;
D O I
10.1080/00207543.2015.1108534
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Assembly lines can be employed successfully in sheltered work centres to better include persons with disabilities in the labour market as well as to improve production efficiency. The optimal assignment of a heterogeneous workforce is known as the assembly line worker assignment and balancing problem (ALWABP). These assembly lines are characterised not only by a heterogeneous workforce, but also by high levels of absenteeism, which makes it more difficult to obtain stable and efficient line balancing solutions. In this paper, an extension of the ALWABP to minimise the expected cycle time under uncertain worker availability is proposed. We model this problem as a two-stage mixed integer program, and propose local search heuristics for solving it. Computational experiments show that stochastic modelling can help to improve the line's efficiency and that the proposed heuristics produce good results for instances of practical size.
引用
收藏
页码:907 / 922
页数:16
相关论文
共 50 条