Design and performance of control and long-term stabilization system for the IRI 3 MeV-Van de Graaff electron accelerator

被引:1
|
作者
Luthjens, LH [1 ]
Vermeulen, MJW [1 ]
Hom, ML [1 ]
机构
[1] Delft Univ Technol, Interfac Reactor Inst, Dept Radiat Chem, NL-2629 JB Delft, Netherlands
关键词
accelerator; relativistic electron beam; control system; energy stabilization;
D O I
10.1016/S0168-9002(00)00505-2
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
A system for control and stabilization of the IRI 3 MeV Van de Graaff electron accelerator is based on a PI-controller. Parameters are derived from the accelerator open-loop response, and refined by simulation for output of nanosecond multi-ampere pulses and DC current to 1 mA. A switched Anti-Windup Loop (AWL) and variable limiters are incorporated. Long-term voltage stability obtained below the charging belt revolution frequency of 5 Hz is +/- 0.05%. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:495 / 498
页数:4
相关论文
共 35 条
  • [21] Design and performance of a free-air exposure system to study long-term effects of ozone on grasslands
    Volk, M
    Geissmann, M
    Blatter, A
    Contat, F
    Fuhrer, J
    ATMOSPHERIC ENVIRONMENT, 2003, 37 (9-10) : 1341 - 1350
  • [22] Design and Long-Term Performance of a Pilot Wastewater Heat Recovery System in a Commercial Kitchen in the Tourism Sector
    Spriet, Jan
    Singh, Ajeet Pratap
    Considine, Brian
    Murali, Madhu K.
    McNabola, Aonghus
    WATER, 2023, 15 (20)
  • [24] Bio-capture of Cr(VI) in a denitrification system: Electron competition, long-term performance, and microbial community evolution
    Zhao, Yingxin
    Wang, Qian
    Yang, Zhifan
    Jia, Xulong
    Cabrera, Jonnathan
    Ji, Min
    JOURNAL OF HAZARDOUS MATERIALS, 2022, 432
  • [25] Long-Term Performance of a Flood Alert System and Upgrade to FAS3: A Houston, Texas, Case Study
    Fang, Zheng
    Bedient, Philip B.
    Buzcu-Guven, Birnur
    JOURNAL OF HYDROLOGIC ENGINEERING, 2011, 16 (10) : 818 - 828
  • [26] Long-term performance assessment of the Telegraph Road Bridge using a permanent wireless monitoring system and automated statistical process control analytics
    O'Connor, Sean M.
    Zhang, Yilan
    Lynch, Jerome P.
    Ettouney, Mohammed M.
    Jansson, Peter O.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2017, 13 (05) : 604 - 624
  • [27] Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander-Glencore Mine
    Estrada, Victor A. Ponce
    Manzano, Elvis J. Huaraya
    MEMORIA INVESTIGACIONES EN INGENIERIA, 2023, (24): : 2 - 12
  • [29] Machine learning modelling of a membrane capacitive deionization (MCDI) system for prediction of long-term system performance and optimization of process control parameters in remote brackish water desalination
    Zhu Y.
    Lian B.
    Wang Y.
    Miller C.
    Bales C.
    Fletcher J.
    Yao L.
    Waite T.D.
    Water Research, 2022, 227
  • [30] Long-Term Performance of a Hybrid-Flow Constructed Wetlands System for Urban Wastewater Treatment in Caldera de Tirajana (Santa Lucia, Gran Canaria, Spain)
    Martel-Rodriguez, Gilberto M.
    Millan-Gabet, Vanessa
    Mendieta-Pino, Carlos A.
    Garcia-Romero, Eva
    Sanchez-Ramirez, Jose R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (22)