Impact of learning and fatigue factors on single machine scheduling with penalties for tardy jobs

被引:1
|
作者
Dondeti, VR [1 ]
Mohanty, BB [1 ]
机构
[1] Norfolk State Univ, Dept Decis Sci, Norfolk, VA 23504 USA
关键词
variable performance rate; 0-1 nested knapsack problem; job penalties; machine scheduling;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a single machine scheduling problem in which the machine experiences the effects of learning or fatigue as it continues to work and the jobs have due dates and are subject to penalties if they are not completed on time. Because of the effects of learning or fatigue, the performance rate of the machine varies over time. As a result, the processing time of a job depends on its work content as well as the total work content of the jobs completed prior to its loading. In this paper, we prove that even when the machine works at a variable rate, the pair-wise interchange of jobs minimizes the maximum tardiness and a simple modification to the well-known Moore-Hodgson's algorithm yields the minimum number of tardy jobs. Further, we formulate the problem of minimizing the total penalty for tardy jobs as a 0-1 knapsack problem with nested constraints, and solve it by using dynamic programming recursion as well as the maximum-weighted network path algorithm. Then we combine these two techniques and solve the 0-1 knapsack problem, by inducing a nested constraint structure and constructing a network with fewer nodes. (C) 1998 Elsevier Science B.V.
引用
收藏
页码:509 / 524
页数:16
相关论文
共 50 条