Scheduling stochastic jobs on a single machine to minimize weighted number of tardy jobs

被引:0
|
作者
Soroush, H. M. [1 ]
机构
[1] Kuwait Univ, Dept Stat & Operat Res, Safat 13060, Kuwait
关键词
Number of tardy jobs; scheduling; single machine; stochastic; PROCESSING TIMES; EXPECTED NUMBER; FLOW-SHOP; DUE-DATE; GENETIC ALGORITHM; MAXIMUM EARLINESS; BICRITERIA; TARDINESS; COMMON;
D O I
暂无
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
An important scheduling problem in manufacturing and service organizations is the on-time deliveries of products and services. This paper addresses a single machine scheduling problem wherein processing times and/or due-dates are random variables and fixed weights (penalties) are imposed on late jobs. The objective is to find the schedule that minimizes the expected weighted number of tardy jobs. The problem is NP-hard; however, we study the three resulting scenarios: the scenario with stochastic processing times and stochastic due-dates, the scenario with deterministic processing times and stochastic due-dates, and the scenario with stochastic processing times and deterministic due-dates. We prove that special cases of these scenarios are solvable optimally in polynomial time, and introduce heuristic methods for their general cases. Our computational results show that the proposed heuristics perform well in producing the optimal or near optimal solutions. The illustrative examples and computational results also demonstrate that the stochasticity of processing times and/or due-dates can affect scheduling decisions.
引用
收藏
页码:123 / 147
页数:25
相关论文
共 50 条