Fuzzy Integral-Based Risk-Assessment Approach for Public-Private Partnership Infrastructure Projects

被引:38
|
作者
Mazher, Khwaja Mateen [1 ]
Chan, Albert P. C. [1 ]
Zahoor, Hafiz [2 ]
Khan, Mohsen Islam [3 ]
Ameyaw, Ernest Effah [4 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon 999077, Hong Kong, Peoples R China
[2] Natl Univ Sci & Technol, Coll Civil Engn, Risalpur Campus 24080, Khyber Pakhtunkhwa, Pakistan
[3] Infrastruct Dev Author Punjab, Contracts Adm, Lahore 54660, Pakistan
[4] Coventry Univ, Sch Energy Construct & Environm, Coventry CV1 5FB, W Midlands, England
关键词
Decision making; Fuzzy set theory; Fuzzy integral; Infrastructure public-private partnerships; Risk analysis; CRITICAL SUCCESS FACTORS; WATER-SUPPLY PROJECTS; GROUP DECISION-MAKING; PPP PROJECTS; ALLOCATION; MODEL; SELECTION; RANKING; STRATEGIES; CHINESE;
D O I
10.1061/(ASCE)CO.1943-7862.0001573
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Adequate assessment of risk is essential to assist the stakeholders in planning for efficient risk allocation and mitigation and to ensure success in business and projects. However, it is problematic due to the difficulty in quantification of certain risks, existence of interactions, and multiattribute structure of the project risk assessment task. This paper reports research in which relevant risks were identified for power and transport infrastructure public-private partnership (PPP) projects, which are globally the most active infrastructure sectors for private investment. It further proposes, demonstrates, and validates a novel multiattribute risk assessment model that supports both sectoral and project risk analysis to assist stakeholders in risk management decision making. A 45-factor risk register, established based on literature review and PPP experts' interviews, was administered to solicit industry-wide perceptions for risk assessment. Application of fuzzy set theory to risk analysis revealed 22 critical risk factors (CRFs) that were categorized into seven critical risk groups (CRGs) of correlated factors using factor analysis. Risk factors that achieved a linguistic assessment of high impact reflect issues related to institutional capacity and the local economy. Further analysis based on fuzzy measure and nonadditive fuzzy integral combined with arithmetic mean helped to obtain an overall risk index (ORI) which indicated a moderate risk outlook for both power and transport infrastructure sectors. Whereas public sector maturity was assessed as a high impact CRG in the power sector, project planning and implementation, project finance, and project revenue were additionally rated as high impact CRGs in the transport infrastructure sector. Demonstration of the developed methodology for a build-operate-transfer (BOT) motorway case study project showed that the private sector stakeholders viewed the project at high risk with all the CRGs evaluated as high impact except the political stability CRG, which was assessed as moderately risky. Test results show that the methodology performed satisfactorily in approximating experts holistic project risk assessments. The developed framework can be used to assess a country's condition or overall project risk at the initial project stage with little input of time and resources, thus facilitating an efficient and robust risk assessment. Application of fuzzy measure based nonadditive fuzzy integral combined with arithmetic mean for sectoral and project risk assessment, and comparison of sectoral risk analysis from a developing country perspective are some of the key features of this study. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] Developing a framework of retained risk in Public-Private Partnership (PPP) social infrastructure projects
    Doloi, H. K.
    Raisbeck, P.
    INNOVATIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, VOLS 1 AND 2, 2008, : 1513 - 1518
  • [22] Determining the range of negotiable prices for public-private partnership infrastructure projects: a simulation approach
    Afshar, Arsalan Zakeri
    Abbasianjahromi, Hamidreza
    Mirhosseini, S. Mohammad
    Ehsanifar, Mohammad
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2025, 43 (01) : 50 - 74
  • [23] Risk Misallocation in Public-Private Partnership Projects in China
    Ke, Yongjian
    Wang, Shouqing
    Chan, Albert P. C.
    INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2013, 16 (03) : 438 - 460
  • [24] Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China
    Chan, Albert P. C.
    Yeung, John F. Y.
    Yu, Calvin C. P.
    Wang, Shou Qing
    Ke, Yongjian
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2011, 27 (03) : 136 - 148
  • [25] Modern Trends in Financing Infrastructure Projects in the Framework of Public-Private Partnership
    Yuzvovich, L., I
    Boytush, O. A.
    Pustovalova, L. M.
    PROCEEDINGS OF THE 2ND INTERNATIONAL SCIENTIFIC AND PRACTICAL CONFERENCE - MODERN MANAGEMENT TRENDS AND THE DIGITAL ECONOMY: FROM REGIONAL DEVELOPMENT TO GLOBAL ECONOMIC GROWTH (MTDE 2020), 2020, 138 : 752 - 759
  • [26] Topic: Power relations in the finance of infrastructure public-private partnership projects
    Liu, Lucia Xiaoyan
    Clegg, Stewart
    Pollack, Julien
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2022, 40 (07) : 725 - 740
  • [27] The applicability of public-private partnership contracts for infrastructure projects as a function of their specificity
    Patrakeeva, O. Yu
    Patrakeev, A. A.
    VESTNIK SANKT-PETERBURGSKOGO UNIVERSITETA-EKONOMIKA-ST PETERSBURG UNIVERSITY JOURNAL OF ECONOMIC STUDIES, 2020, 36 (04): : 601 - 623
  • [28] Public-Private Partnership Projects in Infrastructure: An Essential Guide for Policy Makers
    Gifford, Jonathan L.
    ECONOMIC DEVELOPMENT QUARTERLY, 2013, 27 (03) : 263 - 264
  • [29] Life Cycle Performance Measurement in Public-Private Partnership Infrastructure Projects
    Kim, Soo Yong
    Le Dinh Thuc
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (04)
  • [30] Impact of the Capital Market Collapse on Public-Private Partnership Infrastructure Projects
    Regan, Michael
    Smith, Jim
    Love, Peter E. D.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (01) : 6 - 16