Using performance frontiers to differentiate elective and capacity-based surgical services

被引:0
|
作者
Ranney, Stephen E. [1 ]
Tsai, Mitchell H. [2 ]
Breidenstein, Max W. [2 ]
Sexton, Kevin W. [3 ]
Malhotra, Ajai K. [1 ]
机构
[1] Larner Coll Med, Dept Surg, 111 Colchester Ave, Burlington, VT 05401 USA
[2] Larner Coll Med, Dept Anesthesia, Burlington, VT USA
[3] Univ Arkansas Med Sci, Little Rock, AR 72205 USA
来源
关键词
Efficiency; operating room efficiency; operating room utilization; performance fronts; performance frontiers; ACUTE-CARE SURGERY; IMPACT; OUTCOMES; PRODUCTIVITY; APPENDICITIS; MANAGEMENT;
D O I
10.1097/TA.0000000000003137
中图分类号
R4 [临床医学];
学科分类号
1002 ; 100602 ;
摘要
BACKGROUND Acute care surgery (ACS) model of care delivery has many benefits. However, since the ACS surgeon has limited control over the volume, timing, and complexity of cases, traditional metrics of operating room (OR) efficiency almost always measure ACS service as "inefficient." The current study examines an alternative method-performance fronts-of evaluating changes in efficiency and tests the following hypotheses: (1) in an institution with a robust ACS service, performance front methodology is superior to traditional metrics in evaluating OR throughput/efficiency, and (2) introduction of an ACS service with block time allocation will improve OR throughput/efficiency. METHODS Operating room metrics 1-year pre-ACS implementation and post-ACS implementation were collected. Overall OR efficiency was calculated by mean case volumes for the entire OR and ACS and general surgery (GS) services individually. Detailed analysis of these two specific services was performed by gathering median monthly minutes-in block, out of block, after hours, and opportunity unused. The two services were examined using a traditional measure of efficiency and the "fronts" method. Services were compared with each other and also pre-ACS implementation and post-ACS implementation. RESULTS Overall OR case volumes increased by 5% (999 50 to 1,043 +/- 46: p < 0.05) with almost all of the increase coming through ACS (27 <plus/minus> 4 to 68 +/- 16: p < 0.05). By traditional metrics, ACS had significantly worse median efficiency versus GS in both periods: pre (0.67 [0.66-0.71] vs. 0.80 [0.78-0.81]) and post (0.75 [0.53-0.77] vs. 0.83 [0.84-0.85]) (p < 0.05). As compared with the pre, GS efficiency improved significantly in post (p < 0.05), but ACS efficiency remained unchanged (p > 0.05). The alternative fronts chart demonstrated the more accurate picture with improved efficiency observed for GS, ACS, and combined. CONCLUSION In an institution with a busy ACS service, the alternative fronts methodology offers a more accurate evaluation of OR efficiency. The provision of an OR for the ACS service improves overall throughput/efficiency.
引用
收藏
页码:935 / 941
页数:7
相关论文
共 50 条
  • [1] Competitive acquisition of prioritizable capacity-based ancillary services
    Chicco, G
    Gross, G
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (01) : 569 - 576
  • [2] Towards a Technician Marketplace using Capacity-Based Pricing
    Wolff, Clemens
    Voessing, Michael
    Schmitz, Bjoern
    Fromm, Hansjoerg
    [J]. PROCEEDINGS OF THE 51ST ANNUAL HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES (HICSS), 2018, : 1553 - 1562
  • [3] CAPACITY-BASED PERFORMANCE COMPARISON OF MIMO-BICM DEMODULATORS
    Fertl, Peter
    Jalden, Joakim
    Matz, Gerald
    [J]. 2008 IEEE 9TH WORKSHOP ON SIGNAL PROCESSING ADVANCES IN WIRELESS COMMUNICATIONS, VOLS 1 AND 2, 2008, : 166 - 170
  • [4] Seismic performance of CFS strap-braced walls using capacity-based design approach
    Kasaeian, Shahrzad
    Usefi, Nima
    Ronagh, Hamid
    Dareshiry, Saeed
    [J]. JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2020, 174 (174)
  • [5] Capacity-based performance measurements for loading equipment in open pit mines
    Moniri-Morad, Amin
    Pourgol-Mohammad, Mohammad
    Aghababaei, Hamid
    Sattarvand, Javad
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2019, 26 (06) : 1672 - 1686
  • [6] CAPACITY-BASED ORDER REVIEW RELEASE STRATEGIES TO IMPROVE MANUFACTURING PERFORMANCE
    PHILIPOOM, PR
    FRY, TD
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (11) : 2559 - 2572
  • [7] Performance of capacity-based adaptive STBC-VBLAST MIMO wireless communication
    Key Laboratory of Optoelectronics Devices and Systems, Shenzhen University, Shenzhen, China
    [J]. Int. J. Wireless Mobile Comput., 4 (339-345):
  • [8] Capacity-based uplink scheduling using long-term channel knowledge
    Bandemer, Bernd
    Visuri, Samuli
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS, VOLS 1-14, 2007, : 785 - 790
  • [9] Effective Capacity-based Delay Performance Estimators for LTE Radio Bearer QoS Provision
    Chen, Yu
    Dong, Liang
    Darwazeh, Izzat
    [J]. 2014 9TH INTERNATIONAL SYMPOSIUM ON COMMUNICATION SYSTEMS, NETWORKS & DIGITAL SIGNAL PROCESSING (CSNDSP), 2014, : 105 - 110
  • [10] Capacity-based optimization using whale optimization technique of a power distribution network
    Simachew, Bawoke
    Khan, Baseem
    Guerrero, Josep M.
    Padmanaban, Sanjeevikumar
    Mahela, Om Prakash
    Alhelou, Hassan Haes
    [J]. ENGINEERING REPORTS, 2022, 4 (01)