Capacity-based performance measurements for loading equipment in open pit mines

被引:6
|
作者
Moniri-Morad, Amin [1 ]
Pourgol-Mohammad, Mohammad [2 ]
Aghababaei, Hamid [1 ]
Sattarvand, Javad [3 ]
机构
[1] Sahand Univ Technol, Dept Min Engn, Tabriz 513351996, Iran
[2] Sahand Univ Technol, Dept Mech Engn, Tabriz 513351996, Iran
[3] Univ Nevada, Dept Min & Met Engn, Reno, NV 89557 USA
关键词
capacity; performance; maintainability; mining equipment; risk assessment; RELIABILITY; SHOVEL; MAINTENANCE; TRUCK; MODEL;
D O I
10.1007/s11771-019-4124-5
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
The purpose of this study is to develop an integrated framework for capacity analysis to address the influence of systematic hazardous factors on the haulage fleet nominal capacity. The proposed model was made to capture unexpected risks for mining equipment based upon data-driven method considering different scenarios. Probabilistic risk assessment (PRA) was employed to quantify the loss of production capacity by focusing on severity of failure incidents and maintainability measurements. Discrete-event simulation was configured to characterize the nominal capacity for mining operation. Accordingly, the system capacity was analyzed through the comparison of nominal and actual capacity. A case study was completed to validate the research methodology. The past operation and maintenance field data were collected for shovel operation. The discrete-event simulation was developed to estimate the rate of shovel nominal capacity. Then, the effects of undesirable scenarios were assessed by developing the PRA approach. The research results provide significant insights into how to enhance the production capacity in mines. The analyst gets a well judgment for the crucial elements dealing with high risk levels. A holistic maintenance plan can be developed to mitigate and control the losses.
引用
收藏
页码:1672 / 1686
页数:15
相关论文
共 50 条
  • [1] Capacity-based performance measurements for loading equipment in open pit mines基于能力露天矿山装载设备的性能测量
    Amin Moniri-Morad
    Mohammad Pourgol-Mohammad
    Hamid Aghababaei
    Javad Sattarvand
    [J]. Journal of Central South University, 2019, 26 : 1672 - 1686
  • [2] LOADING BROKEN ROCK AT OPEN-PIT MINES WITH THE USE OF VIBRATING EQUIPMENT
    KORTELEV, OB
    MOLOTILOV, SG
    NORRI, VK
    TISHKOV, AY
    GENDLINA, LI
    LEVENSON, SY
    SAMARTSEV, MG
    [J]. JOURNAL OF MINING SCIENCE, 1994, 30 (03) : 291 - 295
  • [3] LOADING-HAULAGE EQUIPMENT SELECTION IN OPEN PIT MINES BASED ON FUZZY-TOPSIS METHOD
    Bazzazi, A. Aghajani
    Osanloo, M.
    Soltanmohammadi, H.
    [J]. GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2008, 24 (04): : 87 - 102
  • [4] OPEN-PIT EQUIPMENT OPERATING COSTS AT CRAIGMONT MINES LIMITED
    GIBBS, JM
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1968, 61 (671): : 285 - &
  • [5] A study on haulage technology and equipment in large open pit mines in China
    Wang, XF
    Zhao, LZ
    [J]. MINE PLANNING AND EQUIPMENT SECTION 1997, 1997, : 511 - 514
  • [6] OPERATIONAL STABILITY OF PRODUCTION EQUIPMENT SYSTEMS IN OPEN-PIT MINES
    PROKOPENKO, VI
    [J]. SOVIET MINING SCIENCE USSR, 1991, 27 (04): : 344 - 349
  • [7] MAINTENANCE OF WEAR MATERIALS ON OPEN-PIT EQUIPMENT AT HILTON MINES
    MUCHA, A
    GENN, KD
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (692): : 1297 - &
  • [8] ALLOCATION OF TRUCK TRANSPORT TO LOADING POINTS IN OPEN-PIT MINES
    DEMENTEV, BN
    KLIMOVIT.MD
    MARYAKHI.EM
    [J]. AUTOMATION AND REMOTE CONTROL, 1969, (08) : 1256 - &
  • [10] REAL-TIME MONITORING OF HEAVY EQUIPMENT IN OPEN-PIT MINES
    WHITE, JW
    JOHNSON, LV
    [J]. EXCELLENCE IN THE CONSTRUCTED PROJECT, 1989, : 266 - 271