Risk-based optimization of the debt service schedule in renewable energy project finance

被引:5
|
作者
Firouzi, Afshin [1 ]
Meshkani, Ali [1 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Civil Engn, Tehran, Iran
关键词
Renewable energy; Project finance; Debt service schedule; Probability of default; Genetic algorithm; Particle swarm optimization; PARTICLE SWARM OPTIMIZATION; OPTIMAL CAPITAL STRUCTURE; INVESTMENT; CREDIT; POWER;
D O I
10.1016/j.jup.2021.101197
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Project finance is used in capital intensive renewable energy projects worldwide. Financial entities such as large banks and institutional investors are active in providing syndicated loans for infrastructure projects and compete to offer better terms to the sponsors of these projects. The literature is full of research on capital structure optimization. We propose a novel stochastic framework for optimizing the debt service schedule with due regard to the probability of default of the project company. The applicability of the proposed method is demonstrated for a 10 MW solar photovoltaic project employing a genetic algorithm (GA) as the optimization tool. The NASA SSE dataset is used to collect irradiation data, and PVsyst software is employed to simulate the performance of the project. The uncertainties are accounted for using Monte Carlo simulation, and the revenue generated, its corresponding free cash flow and the debt service coverage ratio are simulated as random variables. The proposed optimization framework enables lenders to offer an optimized debt service that maximizes the shareholder's profitability index. A particle swarm optimization is also employed to validate the stability and usefulness of GA optimization.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Risk-based service testing -: Several approaches to the application of risk to IT Service Management
    Sauve, Jacques
    2008 3RD IEEE/IFIP INTERNATIONAL WORKSHOP ON BUSINESS-DRIVEN IT MANAGEMENT, 2008, : 105 - +
  • [32] Schedule Collaborative Optimization for the Engineering Project Based on Stackelberg
    Xue, Weirui
    Zhang, Wei
    Wang, Xuetong
    Zhang, Lei
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 64 - 71
  • [33] A risk-based simulation and multi-objective optimization framework for the integration of distributed renewable generation and storage
    Mena, Rodrigo
    Hennebel, Martin
    Li, Yan-Fu
    Ruiz, Carlos
    Zio, Enrico
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2014, 37 : 778 - 793
  • [34] cvxRiskOpt: A Risk-Based Optimization Tool Based on CVXPY
    Safaoui, Sleiman
    Summers, Tyler H.
    IEEE CONTROL SYSTEMS LETTERS, 2024, 8 : 2163 - 2168
  • [35] Risk-based, genetic algorithm approach to optimize outage maintenance schedule
    Hadavi, S. Mohammad Hadi
    ANNALS OF NUCLEAR ENERGY, 2008, 35 (04) : 601 - 609
  • [36] An integrated model for citizen energy communities and renewable energy communities based on clean energy package: A two-stage risk-based approach
    Dorahaki, Sobhan
    Rashidinejad, Masoud
    Ardestani, Seyed Farshad Fatemi
    Abdollahi, Amir
    Salehizadeh, Mohammad Reza
    ENERGY, 2023, 277
  • [37] Stochastic multi-objective model for optimal energy exchange optimization of networked microgrids with presence of renewable generation under risk-based strategies
    Gazijahani, Farhad Samadi
    Ravadanegh, Sajad Najafi
    Salehi, Javad
    ISA TRANSACTIONS, 2018, 73 : 100 - 111
  • [38] Risk-based Inspection Optimization of the Deteriorating System
    Tan Lin
    Gong Shiyu
    Guo Bo
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 1874 - 1878
  • [39] RISK-BASED INSPECTION OPTIMIZATION FOR VALVE INSPECTIONS
    Vibien, Patrick M.
    Joyal, David A.
    Oliphant, Ken E.
    Luff, William
    PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 3, 2018,
  • [40] Risk-Based Optimization of Inspection Planning in Ships
    Bharadwaj, Ujjwal
    Wintle, John
    JOURNAL OF SHIP PRODUCTION AND DESIGN, 2011, 27 (03): : 111 - 117