Upper limit analysis of stability of the water-resistant rock mass of a Karst tunnel face considering the seepage force

被引:27
|
作者
Wu, Wenlong [1 ,2 ]
Liu, Xiliang [1 ,2 ]
Guo, Jiaqi [1 ,2 ,3 ]
Sun, Feiyue [1 ,2 ]
Huang, Xin [1 ,2 ,3 ]
Zhu, Zhengguo [3 ]
机构
[1] Henan Polytech Univ, Sch Civil Engn, Jiaozuo 454000, Henan, Peoples R China
[2] Key Lab Henan Prov Underground Engn & Disaster Pr, Jiaozuo 454000, Henan, Peoples R China
[3] Shijiazhuang Tiedao Univ, State Key Lab Mech Behav & Syst Safety Traff Engn, Shijiazhuang 050043, Hebei, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Karst tunnel; Water-resistant rock mass of the tunnel face; Stability; Upper limit analysis; Hoek-Brown failure criterion; Seepage force; MINIMUM SAFE THICKNESS; INRUSH; MODEL; MECHANISM; FAILURE; CAVE; PLUG;
D O I
10.1007/s10064-021-02283-6
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Based on the upper limit theorem of limit analysis and the Hoek-Brown failure criterion and considering the adverse influence of the seepage force, we established a stability analysis method of analyzing the water-resistant rock mass of a karst tunnel face, developed a critical safety thickness criterion for water inrush caused by the instability of the tunnel face, and conducted a sensitivity analysis of the main influencing parameters. We defined the safety coefficient (k) of the tunnel face's resistance to water-inrush instability during the tunnel excavation process and analyzed the dynamic evolution characteristics of the tunnel face's stability during the tunnel construction according to the safety coefficient. We used the method introduced in this paper to calculate the safe thickness of the water-resistant rock mass of the Xiema tunnel face in the first horizontal line of the Chongqing Expressway where it is adjacent to karst cavity 268. We compared these results with the calculation results of a method that did not consider the adverse influence of the karst water seepage force. The results showed that the safety thickness of the water-resistant rock mass calculated using the method proposed in this paper more accurately conformed to the actual situation of the project, which can more effectively ensure the construction safety of the tunnel segment adjacent to the anterior, concealed, high-pressure, water-rich karst cavity. The results of this study hold great significance for improving the predictability and targeted prevention of water-inrush disasters in karst tunnels.
引用
收藏
页码:5813 / 5830
页数:18
相关论文
共 47 条
  • [21] Evolution Characteristics Analysis of Displacement and Seepage Pressure of Water Inrush in Karst Tunnel Face with Layered Structure
    School of Civil Engineering, Henan Polytechnic University, Jiaozuo
    454000, China
    不详
    471023, China
    J. Eng. Sci. Technol. Rev., 4 (37-43):
  • [22] Progressive Failure of Water-Resistant Stratum in Karst Tunnel Construction Using an Improved Meshfree Method Considering Fluid–Solid Interaction
    Zhou, Yuanyuan
    Xia, Chengzhi
    Shi, Zhenming
    Lu, Guangyin
    Liu, Liu
    Liu, Maomao
    Buildings, 2024, 14 (10)
  • [23] A study of the rock mass stability of a tunnel group based on numerical limit analysis
    Kong, C. (394757022@qq.com), 1600, China Railway Southwest Research Institute Co. Ltd., No.97 Gunan Street, West Hi-Tech Zone, Chengdu, 611731, China (50):
  • [24] Upper bound analysis of factor of safety for shield tunnel face subjected to underground water seepage
    Huang F.
    Pan Q.-J.
    Ling T.-H.
    1600, Chinese Society of Civil Engineering (39): : 1461 - 1469
  • [25] Upper-bound limit analysis of tunnel face stability under advanced support
    Chen Zheng
    He Ping
    Yan Du-min
    Gao Hong-jie
    Nie Ao-xiang
    ROCK AND SOIL MECHANICS, 2019, 40 (06) : 2154 - 2162
  • [26] FLUID-SOLID COUPLING ANALYSIS OF SURROUNDING ROCK MASS STABILITY AND WATER INFLOW FORECAST OF A TUNNEL IN KARST ZONE
    Dai Yifei
    Li Xinping
    Hu Jing
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 301 - 308
  • [27] Upper bound analysis of collapse failure of deep tunnel under karst cave considering seismic force
    Lyu, Cheng
    Yu, Li
    Wang, Mingnian
    Xia, Pengxi
    Sun, Yuan
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2020, 132
  • [28] An Improved Failure Model Considering the Arching Effect for Tunnel Face Stability in a Weak and Fractured Rock Mass
    Kong, Desen
    Teng, Sen
    Shi, Jian
    Zhao, Mingkai
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2024, 24 (06)
  • [29] Numerical analysis of influence of Karst caves beside the tunnel on stability of its surrounding rock mass
    Zhao, Ming-Jie
    Wang, Xue-Jun
    Liu, Xu-Hua
    Ao, Jian-Hua
    Wang, Biao
    Chongqing Jianzhu Daxue Xuebao/Journal of Chongqing Jianzhu University, 2003, 25 (01):
  • [30] Parameter analysis of excavation face stability of shield tunnel under high water pressure seepage
    Cheng, Xuansheng
    Zhang, Shanglong
    Zhou, Xinhai
    Xia, Peiyan
    PHYSICS AND CHEMISTRY OF THE EARTH, 2022, 128