Engineering Study of a Pilot Scale Process Plant for Microalgae-Oil Production Utilizing Municipal Wastewater and Flue Gases: Fukushima Pilot Plant

被引:21
|
作者
Sasongko, Nugroho Adi [1 ,2 ]
Noguchi, Ryozo [3 ]
Ito, Junko [4 ]
Demura, Mikihide [4 ]
Ichikawa, Sosaku [3 ]
Nakajima, Mitsutoshi [4 ]
Watanabe, Makoto M. [4 ]
机构
[1] Univ Tsukuba, Grad Sch Life & Environm Sci, 1-1-1 Tennodai, Tsukuba, Ibaraki 3058572, Japan
[2] Agcy Assessment & Applicat Technol BPPT, Jakarta 10340, Indonesia
[3] Univ Tsukuba, Fac Life & Environm Sci, 1-1-1 Tennodai, Tsukuba, Ibaraki 3058572, Japan
[4] Univ Tsukuba, Algae Biomass & Energy Syst R&D Ctr, 1-1-1 Tennodai, Tsukuba, Ibaraki 3058572, Japan
来源
ENERGIES | 2018年 / 11卷 / 07期
关键词
engineering design; energy balance; CO2; emission; microalgae oil; municipal wastewater; process simulation; HYDROTHERMAL LIQUEFACTION; BIOFUEL PRODUCTION; BIO-CRUDE; BIODIESEL PRODUCTION; VERTICAL MIGRATION; CHLORELLA-VULGARIS; FUTURE-PROSPECTS; ALGAL BIOMASS; RACEWAY PONDS; CULTIVATION;
D O I
10.3390/en11071693
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This article presents an engineering study of an integrated system to produce bio-oil from microalgae biomass. The analysis is based on a pilot plant located at Minami-soma Fukushima, Japan, which further simulates 1 ha based-cultivation. Municipal wastewater and flue gases were utilized as nutrient sources for the microalgae culture of the proposed design. A flow sheet diagram of the integrated plant was synthesized by process engineering software to allow simulation of a continuous system. The design and sizing of the process equipment were performed to obtain a realistic estimation of possible production cost. The results demonstrated that nutrient savings was achieved by wastewater and CO2 utilization to the polyculture of native microalgae. Process simulation gave an estimated CO2 sequestration of 82.77 to 140.58 tons ha(-1)year(-1) with 63 to 107 tons ha(-1)year(-1) of potential biomass production. The integrated process significantly improved the energy balance and economics of biofuel production and also the wastewater treatment plant (WWTP). The economic analysis confirmed that higher biomass production and technology improvement were required to achieve operational feasibility and profitability of the current microalgae-based bio-oil production.
引用
收藏
页数:24
相关论文
共 50 条
  • [31] Pilot scale study on short-cut biological nitrogen removal of municipal wastewater with SBR process
    Yang, Qing
    Wang, Shu-Ying
    Yang, An-Ming
    Guo, Jian-Hua
    Peng, Yong-Zhen
    Zhongguo Huanjing Kexue/China Environmental Science, 2007, 27 (02): : 150 - 154
  • [32] Feedforward control for nitrogen removal in a pilot-scale anaerobic-anoxic-oxic plant for municipal wastewater treatment
    Tonggang Shen
    Hanchang Shi
    Huiming Shi
    He Jing
    Huilei Xiong
    Frontiers of Environmental Science & Engineering in China, 2011, 5 : 130 - 139
  • [33] Feedforward control for nitrogen removal in a pilot-scale anaerobic-anoxic-oxic plant for municipal wastewater treatment
    Shen, Tonggang
    Shi, Hanchang
    Shi, Huiming
    Jing, He
    Xiong, Huilei
    FRONTIERS OF ENVIRONMENTAL SCIENCE & ENGINEERING IN CHINA, 2011, 5 (01): : 130 - 139
  • [34] STUDY OF THE PRODUCTION OF WASH OIL OF IMPROVED QUALITY UNDER PILOT PLANT CONDITIONS.
    Kovalev, E.T.
    Gogoleva, T.Ya.
    Privalov, V.E.
    Gruzhii, N.I.
    Markus, G.A.
    Coke & Chemistry (USSR) (English translation of Koks i Khimiya), 1985, (02): : 53 - 56
  • [35] Pilot-plant study of wastewater sludge, decontamination using a ferrous sulfate bioleaching process
    Mercier, Guy
    Drogui, Patrick
    Blais, Jean-Francois
    Chartier, Myriam
    WATER ENVIRONMENT RESEARCH, 2006, 78 (08) : 872 - 879
  • [36] Electrochemical pilot-scale plant for oil field produced wastewater by M/C/Fe electrodes for injection
    Ma, Hongzhu
    Wang, Bo
    JOURNAL OF HAZARDOUS MATERIALS, 2006, 132 (2-3) : 237 - 243
  • [37] STUDIES ON THE PROCESS OF RECOVERING LOW-TEMPERATURE WASTE HEAT FROM A FLUE GAS IN A PILOT-SCALE PLANT
    Szulc, Piotr
    Tietze, Tomasz
    Wojs, Kazimierz
    CHEMICAL AND PROCESS ENGINEERING-INZYNIERIA CHEMICZNA I PROCESOWA, 2016, 37 (04): : 529 - 543
  • [38] Pilot plant study to assess the fate of two volatile methyl siloxane compounds during municipal wastewater treatment
    Parker, WJ
    Shi, JC
    Fendinger, NJ
    Monteith, HD
    Chandra, G
    ENVIRONMENTAL TOXICOLOGY AND CHEMISTRY, 1999, 18 (02) : 172 - 181
  • [39] A pilot-scale study of tertiary treatment of JIZHUANGZI Wastewater Treatment Plant by continuous preozonation-microflocculation-filtration process
    Lu, SG
    Imai, T
    An, DN
    Ukita, M
    ENVIRONMENTAL TECHNOLOGY, 2001, 22 (03) : 331 - 337
  • [40] A pilot-scale study on PVA gel beads based integrated fixed film activated sludge (IFAS) plant for municipal wastewater treatment
    Singh, Nitin Kumar
    Singh, Jasdeep
    Bhatia, Aakansha
    Kazmi, A. A.