Risk-Cost Optimization of Hydraulic Structures: Methodology and Case Study

被引:42
|
作者
Rasekh, Amin [1 ]
Afshar, Abbas [2 ]
Afshar, Mohammad Hadi [2 ]
机构
[1] Texas A&M Univ, Zachry Dept Civil Engn, College Stn, TX 77843 USA
[2] Iran Univ Sci & Technol, Dept Civil Engn, Tehran 1684613114, Iran
关键词
Hydraulic structures; Multi-objective optimization; Uncertainty analysis; Risk management; Bakhtiari Dam; HYDROLOGIC UNCERTAINTIES; SPILLWAY CAPACITY; NSGA-II; DESIGN; DAM; DIVERSION; RESERVOIR;
D O I
10.1007/s11269-010-9582-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Simultaneous consideration of initial construction cost and failure risk in practical design of critical hydraulic structures is a long-standing problem in water resources planning and management. Despite extensive efforts to effectively tackle this problem during recent decades, the traditional rather inefficient technique of return period approach still enjoys being the dominant technique in real-world projects. Accordingly, this article aims at developing an innovative evolutionary-computation-based multi-objective model as a remedy to shortcomings of existing common methods. This simulation-optimization framework generates a series of uniformly distributed trade-off solutions which represent the compromise between competing objectives of construction cost and failure risk. Hydrologic and hydraulic uncertainties along with flood routing process are considered in the optimization process to provide a more complete picture of the problem. This approach is demonstrated and discussed for flood diversion system of Bakhtiari Dam in Iran and the Pareto optimal fronts are found for different combinations of uncertainties. The presented multi-objective approach can effectively enlarge the decision maker's scope to more efficiently determine the optimum design of the system.
引用
收藏
页码:2833 / 2851
页数:19
相关论文
共 50 条
  • [21] Risk-Cost Analysis for the Regulation of Airborne Toxic Substances in a Developing Context: The Case of Arsenic in Chile
    R. O'Ryan
    M. Díaz
    [J]. Environmental and Resource Economics, 2000, 15 : 115 - 134
  • [22] Risk-Cost Optimized Maintenance Strategy for Steel Bridge Subjected to Deterioration
    Li, Le
    Mahmoodian, Mojtaba
    Khaloo, Alireza
    Sun, Zhiyan
    [J]. SUSTAINABILITY, 2022, 14 (01)
  • [23] A Risk-Cost Minimization Model for Catastrophe Averse Shipment of Hazardous Materials
    Nagae, Takeshi
    [J]. 2008 PROCEEDINGS OF SICE ANNUAL CONFERENCE, VOLS 1-7, 2008, : 1129 - 1134
  • [24] The application of a risk-cost assessment model for the evaluation of fire safety in buildings
    Yung, D
    Beck, VR
    [J]. COST ACTION E5 WORKSHOP ON FIRE SAFETY OF MEDIUM-RISE TIMBER FRAME RESIDENTIAL BUILDINGS, 1998, 179 : 70 - 88
  • [25] APPLICATION OF RISK-COST BENEFIT TECHNIQUES TO ALARA AND DE-MINIMIS
    KATHREN, RL
    MUNSON, LH
    HIGBY, DP
    [J]. HEALTH PHYSICS, 1984, 47 (01): : 195 - 195
  • [26] Optimization of RC Structures in Terms of Cost and Environmental Impact-Case Study
    Zenisek, Michal
    Pesta, Jan
    Tipka, Martin
    Koci, Vladimir
    Hajek, Petr
    [J]. SUSTAINABILITY, 2020, 12 (20) : 1 - 25
  • [27] The Decision Accuracy of Acquaintance List from Different Risk-cost Analysis
    Purwanto, Yudha
    Kuspriyanto
    Hendrawan
    Rahardjo, Budi
    [J]. 2018 12TH INTERNATIONAL CONFERENCE ON TELECOMMUNICATION SYSTEMS, SERVICES, AND APPLICATIONS (TSSA), 2018,
  • [28] Methodology for assessing the cost of failure - A case study
    Hinds, PA
    Kumar, UD
    [J]. IETE TECHNICAL REVIEW, 2001, 18 (01) : 33 - 39
  • [29] Risk-cost optimization for procurement planning in multi-tier supply chain by Pareto Local Search with relaxed acceptance criterion
    Mori, Masakatsu
    Kobayashi, Ryoji
    Samejima, Masaki
    Komoda, Norihisa
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (01) : 88 - 96
  • [30] A genetic algorithm solution for a nuclear power plant risk-cost maintenance model
    Tong, JJ
    Mao, DY
    Xue, DZ
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2004, 229 (01) : 81 - 89