Twenty Years of Dam Safety Risk Analysis and Risk Management Practice at the Bureau of Reclamation

被引:0
|
作者
Knight, Karen A. [1 ]
机构
[1] Bur Reclamat, Dam Safety Off, POB 25007, Denver, CO 80225 USA
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The desire to more appropriately prioritize resources within U.S. Department of Interior (DOI) Bureau of Reclamation (Reclamation) and to better understand the risk posed by its dams to the public required Reclamation to move beyond a deterministic based assessment of its dams. Risk assessment and risk management were viewed as a logical method to prioritize these resources for the most benefit to the public. Through research and development, Reclamation pioneered the application of risk assessment to its portfolio of 366 high hazard dams. Since the late 1990s, Reclamation has performed over 1300 quantitative and semi-quantitative risk analysis on its portfolio of dams. This paper discusses early efforts in risk assessment, the evolution of risk analysis within Reclamation's dam safety program, and current use including risk-informed decision making. The paper will focus on current practice in risk assessment at Reclamation and the application of these assessments to the overall risk management of the dam safety program.
引用
收藏
页码:234 / 242
页数:9
相关论文
共 50 条
  • [21] Dam safety and risk management in China and its strategic consideration
    Li, Lei
    Cai, Yue-Bo
    Sheng, Jin-Bao
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2008, 30 (11): : 1581 - 1587
  • [22] Risk analysis of a seepage piping dam safety issue
    Dise, KM
    MANAGING THE RISKS OF DAM PROJECT DEVELOPMENT, SAFETY AND OPERATION, 1998, : 471 - 493
  • [23] Dam safety: From the engineer's duty to risk management
    Lecornu, J.
    International Journal on Hydropower and Dams, 1998, 5 (02): : 53 - 56
  • [24] Risk and uncertainty in dam safety
    Hoeg, Kaare
    GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2007, 1 (02) : 120 - 121
  • [25] The suitability of risk reduction indicators to inform dam safety management
    Morales-Torres, Adrian
    Serrano-Lombillo, Armando
    Escuder-Bueno, Ignacio
    Altarejos-Garcia, Luis
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2016, 12 (11) : 1465 - 1476
  • [26] Applying risk analysis and risk management techniques in safety and in wider business risk management
    Harrison, J
    MARINE RISK ASSESSMENT: A BETTER WAY TO MANAGE YOUR BUSINESS, CONFERENCE PROCEEDINGS, PT II, 1997, 109 (03): : 17 - 20
  • [27] Risk management at Wahleach Dam
    Salmon, G
    Cattanach, D
    Hartford, D
    CIVIL ENGINEERING, 1997, 67 (02): : 39 - 41
  • [28] Linking risk analysis to safety management
    Trbojevic, V
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 1032 - 1037
  • [29] Risk management of wastewater reclamation and reuse
    Liu Yuling
    Zhao Hong
    Wang Jisen
    Wang Jiefa
    PROGRESS IN ENVIRONMENTAL SCIENCE AND TECHNOLOGY, VOL I, 2007, : 989 - 993
  • [30] Safety management in construction: 20 years of risk modeling
    Alkaissy, Maryam
    Arashpour, Mehrdad
    Ashuri, Baabak
    Bai, Yu
    Hosseini, Reza
    SAFETY SCIENCE, 2020, 129