Twenty Years of Dam Safety Risk Analysis and Risk Management Practice at the Bureau of Reclamation

被引:0
|
作者
Knight, Karen A. [1 ]
机构
[1] Bur Reclamat, Dam Safety Off, POB 25007, Denver, CO 80225 USA
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The desire to more appropriately prioritize resources within U.S. Department of Interior (DOI) Bureau of Reclamation (Reclamation) and to better understand the risk posed by its dams to the public required Reclamation to move beyond a deterministic based assessment of its dams. Risk assessment and risk management were viewed as a logical method to prioritize these resources for the most benefit to the public. Through research and development, Reclamation pioneered the application of risk assessment to its portfolio of 366 high hazard dams. Since the late 1990s, Reclamation has performed over 1300 quantitative and semi-quantitative risk analysis on its portfolio of dams. This paper discusses early efforts in risk assessment, the evolution of risk analysis within Reclamation's dam safety program, and current use including risk-informed decision making. The paper will focus on current practice in risk assessment at Reclamation and the application of these assessments to the overall risk management of the dam safety program.
引用
收藏
页码:234 / 242
页数:9
相关论文
共 50 条
  • [1] Implementation of risk analysis principles into the bureau of Reclamation's dam safety program actions
    Achterberg, D
    Hennig, C
    Redlinger, C
    MANAGING THE RISKS OF DAM PROJECT DEVELOPMENT, SAFETY AND OPERATION, 1998, : 279 - 294
  • [2] Implementation of risk analysis principles into the bureau of reclamation's dam safety program actions
    Achterberg, D
    Hennig, C
    Redlinger, C
    ASSOCIATION OF STATE DAM SAFETY OFFICIALS 1998 ANNUAL CONFERENCE PROCEEDINGS, 1998, : 49 - 60
  • [3] Risk analysis in dam safety practice
    Vick, SG
    Stewart, RA
    UNCERTAINTY IN THE GEOLOGIC ENVIRONMENT: FROM THEORY TO PRACTICE, VOLS 1 AND 2: PROCEEDINGS OF UNCERTAINTY '96, 1996, (58): : 586 - 603
  • [4] Bureau of Reclamation's dam safety program
    Achterberg, D
    DEALING WITH AGING DAMS, 1999, : 41 - 50
  • [5] Dam safety review finds Bureau of Reclamation program ''effective''
    不详
    FISHERIES, 1997, 22 (05) : 51 - 51
  • [6] Risk analysis for dam safety
    Salmon, G.M.
    Hartford, D.N.D.
    International Water Power and Dam Construction, 1995, 47 (03): : 42 - 47
  • [7] United States Bureau of Reclamation security risk analysis (RSRA)
    Chavira, M
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1455 - 1463
  • [8] Australian practice in Dam safety Risk Assessment
    Fell, R
    REDUCING RISK FROM EXTREME EVENTS, 2003, : 1 - 21
  • [9] Portfolio risk assessment: A tool for dam safety risk management
    Bowles, DS
    Anderson, LR
    Glover, TF
    Chauhan, SS
    MANAGING THE RISKS OF DAM PROJECT DEVELOPMENT, SAFETY AND OPERATION, 1998, : 317 - 334
  • [10] Fuzzy risk analysis on overflowing dam and its application in safety management of earth dam
    Ma, RY
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1785 - 1791