Global Sensitivity Analysis for Excavation Stability in Large-Diameter Shield Tunnel Construction

被引:0
|
作者
Liu, Wenli [1 ]
Chen, Elton J. [2 ]
Wang, Chenwen [2 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Civil Engn & Mech, Wuhan, Hubei, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Civil Engn & Mech, Dept Construct Management, Wuhan, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
MODEL; PARAMETERS; ESTIMATOR; OUTPUT; TBM;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The application of the large-scale slurry-balance shield machine in super-large tunnel excavation (diameter>14m) is much more difficult and risky than the common shield tunneling. In this study, a super-large shield tunnel, Wuhan Yangtze River Road-Rail Tunnel ((WYRT)-T-3) in China, is introduced. Civil information model (CIM) is used to monitor the operation of the super-large shield machine through a thousand parameters. For the site engineers, how to efficiently monitor and interpret the engineering data to guarantee construction safety remains a challenging issue. In order to identify the significant control parameters of the shield tunneling, this study proposed a global sensitivity analysis (GSA) framework for the tunneling data flow in CIM. The results show that (1) the sensitivity results fluctuate greatly, and different soil sections show different input-output correlations, and (2) identifying the most significant and insignificant factors helps to improve the understanding of the model behavior. This research contributes to (1) the body of knowledge by proposing a robust data analysis methodology that can cope with aleatory and epistemic uncertainty, and (2) the state of practice by providing a GSA model to identify the significant control parameters of the shield tunneling.
引用
收藏
页码:285 / 294
页数:10
相关论文
共 50 条
  • [21] Opening the excavation chamber of the large-diameter size slurry shield: A case study in Nanjing Yangtze River Tunnel in China
    Min, Fanlu
    Zhu, Wei
    Lin, Cheng
    Guo, Xinjun
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 46 : 18 - 27
  • [22] Study on the Effects of Artificial Trapezoidal Freezing Soil Mass on the Stability of Large-Diameter Shield Tunnel Portal
    Peng, Shuai
    Xiong, Feng
    Yang, Fan
    Hu, Li
    Wang, Xuebin
    Li, Fan
    APPLIED SCIENCES-BASEL, 2022, 12 (23):
  • [23] Disaster mechanism analysis for segments floating of large-diameter shield tunnel construction in the water-rich strata: A case study
    Shi, Zhou
    Xu, Jinfeng
    Xie, Xiongyao
    Zeng, Hongbo
    Xu, Weijiang
    Niu, Gang
    Xiao, Zhonglin
    ENGINEERING FAILURE ANALYSIS, 2024, 157
  • [24] Theoretical analysis on the deformation of existing tunnel caused by under-crossing of large-diameter slurry shield considering construction factors
    Ding, Zhi
    Zhang, Mo-Bao
    Zhang, Xiao
    Wei, Xin-Jiang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 133
  • [25] Global sensitivity analysis of influential parameters for excavation stability of metro tunnel
    Liu, Wenli
    Ding, Lieyun
    AUTOMATION IN CONSTRUCTION, 2020, 113
  • [26] The numerical analysis for the segments floating mechanism of the large-diameter shield tunnel in the Rich Water Strata
    Key Laboratory of Geotechnical and Underground Engineering, Ministry of Education, Tongji University, Shanghai, China
    不详
    Tunn. Better Life - Proc. World Tunn. Congr., (1174-1182):
  • [27] Research on construction scheme and practice of large-diameter shield for metro engineering
    School of Civil & Architecture Engineering, Beijing Jiaotong University, Beijing, China
    不详
    不详
    Mod. Tunn. Technol., 6 (7-13):
  • [28] On the Analysis Methods of Face Stability in Shield Tunnel Excavation
    Bin, Zhi
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, PROCEEDINGS, 2009, : 433 - 436
  • [29] Research on Stress Characteristics of Segment Structure during the Construction of the Large-Diameter Shield Tunnel and Cross-Passage
    Tan, Zhongsheng
    Li, Zonglin
    Tang, Wei
    Chen, Xueying
    Duan, Junmeng
    SYMMETRY-BASEL, 2020, 12 (08):
  • [30] Settlement characteristics of large-diameter shield excavation below existing subway in close vicinity
    Fang, Qian
    Du, Jian-ming
    Li, Jian-ye
    Zhang, Ding-li
    Cao, Li-qiang
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2021, 28 (03) : 882 - 897