Completion of the southern African large telescope (SALT) primary mirror system

被引:11
|
作者
Swiegers, J [1 ]
Gajjar, H [1 ]
机构
[1] S African Astron Observ, So African Large Telescope, Cape Town, South Africa
来源
关键词
primary mirror; segmented; alignment; 10-m class telescope; cost effective; design solutions;
D O I
10.1117/12.551410
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
On completion by the end of 2004 the Southern African Large Telescope (SALT) being erected in Sutherland, South Africa, will be the largest single optical telescope in the southern hemisphere. This paper addresses the process of designing, building and demonstrating a high performance primary mirror system for SALT that meets the overall telescope requirements. Throughout the process consideration was given to the fact that SALT is budget sensitive, which required careful allocation of funds among the various subsystems, innovative designs, and using COTS components where possible. The process delivered subsystems with a very high cost-performance ratio.
引用
收藏
页码:881 / 891
页数:11
相关论文
共 50 条
  • [41] Recent Progress of Active Support System for Large Optical Telescope Primary Mirror
    Xu Hong
    Yang Liwei
    Yang Huisheng
    LASER & OPTOELECTRONICS PROGRESS, 2018, 55 (10)
  • [42] Worth its SALT: four years of full science operations with the Southern African Large Telescope
    Vaeisaenen, Petri
    Coetzee, Chris
    Schroeder, Anja
    Crawford, Steven M.
    Buckley, David A. H.
    Brink, Janus
    Depagne, Eric
    Kniazev, Alexei
    Koen, Thea
    Kotze, Paul
    Marang, Fred
    Miszalski, Brent
    Colmenero, Encarni Romero
    Strydom, Ockert
    Van Wyk, Veronica
    Williams, Theodore B.
    OBSERVATORY OPERATIONS: STRATEGIES, PROCESSES, AND SYSTEMS VI, 2016, 9910
  • [43] Large-telescope primary mirror coating technology
    Du, Weichuan
    Liu, Hongxiang
    Pei, Wenjun
    Wang, Changjun
    Qiangjiguang Yu Lizishu/High Power Laser and Particle Beams, 2012, 24 (02): : 365 - 369
  • [44] Primary Mirror Aluminizing Operations at the Large Binocular Telescope
    Hill, J. M.
    Atwood, B.
    Edwards, M. L.
    Gardiner, M.
    Haddad, J. P.
    Howard, J.
    Pappalardo, D. P.
    Riedl, J.
    Sabol, B. A.
    Williams, J. T.
    ADVANCES IN OPTICAL AND MECHANICAL TECHNOLOGIES FOR TELESCOPES AND INSTRUMENTATION IV, 2020, 11451
  • [45] Control of the California Extremely Large Telescope primary mirror
    MacMartin, DG
    Chanan, G
    FUTURE GIANT TELESCOPES, 2003, 4840 : 69 - 80
  • [46] GLASS OF THE PRIMARY MIRROR OF THE LARGE AZIMUTHAL TELESCOPE (LAT).
    Buzhinskii, I.M.
    Koryagina, E.I.
    Dmitrieva, Z.P.
    Soviet Journal of Optical Technology (English translation of Optiko-Mekhanicheskaya Promyshlennost), 1976, 43 (11): : 669 - 671
  • [47] GLASS OF PRIMARY MIRROR OF LARGE AZIMUTHAL TELESCOPE (LAT)
    BUZHINSKII, IM
    KORYAGINA, EI
    DMITRIEVA, ZP
    SOVIET JOURNAL OF OPTICAL TECHNOLOGY, 1976, 43 (11): : 669 - 671
  • [48] Primary mirror system for the first Magellan telescope
    Martin, HM
    Allen, RG
    Cuerden, B
    DeRigne, ST
    Dettmann, LR
    Ketelsen, DA
    Miller, SM
    Parodi, G
    Warner, S
    OPTICAL DESIGN, MATERIALS, FABRICATION, AND MAINTENANCE, 2000, 4003 : 2 - 13
  • [49] The active primary mirror system for the SOAR telescope
    Neufeld, C
    Zolcinski-Couet, MC
    Keane, M
    Ruthven, G
    GROUND-BASED TELESCOPES, PTS 1 AND 2, 2004, 5489 : 870 - 880
  • [50] Optimum Design of the Lateral Support System for Primary Mirror of Large-aperture Telescope
    Wang, Yang
    Zhang, Jing-Xu
    Wu, Xiao-Xia
    PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHANICS AND CIVIL ENGINEERING, 2014, 7 : 891 - +