Total nitrogen removal in two-step biofiltration

被引:12
|
作者
Pujol, R [1 ]
Tarallo, S [1 ]
机构
[1] Degremont Res Ctr, F-78230 Le Pecq, France
关键词
biofiltration; nitrogen removal; pre-denitrification; recycling; fixed biofilm; methanol; wastewater;
D O I
10.2166/wst.2000.0427
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A one-year study was carried out on two semi-industrial submerged up-flow biofilters - a predenitrification (pre-DN) step followed by a nitrifying (N) step, designed to treat the primary settled municipal wastewater of a full scale plant for both carbon and nitrogen removal. Performances of the pre-DN step have been investigated showing high removal denitrifying capacities - 1 to 1.2 kg NO3--N removed per m(3) of reactor per day-, obtained with high TSS and carbon loading rates, at a water velocity up to 21.5 m(3)/m(2).h. The complete treatment plant - primary settlement + pre-DN/N loop - has demonstrated a nitrogen removal efficiency ranging from 70% without any additional carbon, up to 85% with methanol. COD and TSS removal rates were 91 % and 97% respectively. The above results show that two submerged biofilters in series form a treatment line suitable for nitrogen removal. This technical choice leads to very compact full scale plants such as Ahlen WWTP (Germany, 85 000 PE).
引用
收藏
页码:65 / 68
页数:4
相关论文
共 50 条